ELE18-02485
| Final | 10/24/2018 | 10/24/2018 | 10/24/2018 2:15:03 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall...ok to final
|
ELE18-03323
| Permanent Service | 10/23/2018 | 10/24/2018 | 10/24/2018 1:54:12 PM | P | PASS |
|
|
changing out meter base to feed the shop. Installing a 200 amp all in one. Power shut off with Idaho power at 9 am. need ok to energize for them to do a reconnect. Phone #: ###-#### Inspection requested via web by Brian Hughes..
p/s u/g reconnect ok
|
ELE18-02488
| Final | 10/24/2018 | 10/24/2018 | 10/24/2018 1:20:45 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall...ok to final
|
ELE18-02966
| Final | 10/24/2018 | 10/24/2018 | 10/24/2018 12:36:21 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall... 1...kitchen outlets shall be installed completely..110.3(A)...tile needs installed complete
|
ELE18-04095
| Electrical Rough-In | 10/23/2018 | 10/24/2018 | 10/24/2018 11:22:22 AM | A | PASS |
|
|
Hi If you could give a call a few min in advance i can meet you there... Thanks! Todd Phone #: ###-#### Inspection requested via web by Richard Gratiot...ok to cover...upstairs bathrooms
|
ELE18-04011
| Electrical Rough-In | 10/23/2018 | 10/24/2018 | 10/24/2018 11:01:11 AM | A | FAIL |
|
|
Ceiling inspection please Phone #: ###-#### Inspection requested via web by Winters LLC... 1..luminaires shall be securely fastened to the ceiling framing...earthquake clips-410.36(B) 2..low volt wiring shall be removed or supported off ceiling grid
|
ELE18-02339
| Electrical Rough-In | 10/23/2018 | 10/24/2018 | 10/24/2018 10:18:51 AM | A | CANC |
|
|
Alex Phone #: ###-####... inspection needed to be a perm service inspection
|
ELE18-02339
| Permanent Service | 10/24/2018 | 10/24/2018 | 10/24/2018 10:18:15 AM | A | PASS |
|
|
Alex Phone #: ###-####... p/s o/h reconnect ok
|
ELE18-04038
| Electrical Rough-In | 10/23/2018 | 10/24/2018 | 10/24/2018 9:49:41 AM | A | PASS |
|
|
PVC Conduits in floor for cover. The area is directly in front when you walk in and just need to go through barrier by unzipping the viz-queen. Phone #: ###-#### Inspection requested via web by Anastacio Fuentes... ok to cover underground
|
ELE18-04093
| Electrical Rough-In | 10/23/2018 | 10/24/2018 | 10/24/2018 9:25:57 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by sam petterson... rough ok to cover new mst with bathroom hot tub wire...hot tub needs installed for final discussed with homeowner location of tub and requirements for lighting above and windows within 5ft...also called contractor and discussed
|
ELE18-03834
| Electrical Rough-In | 10/23/2018 | 10/24/2018 | 10/24/2018 8:27:22 AM | A | PASS |
|
|
allen Phone #: ###-####... kitchen remodel rough ok to cover
|