BLD18-03017
| BLD-Footing | 10/24/2018 | 10/24/2018 | 10/25/2018 8:57:58 AM | P | PASS |
|
|
Matt Phone #: ###-####
|
BLD16-02008
| BLD-Conference | 10/24/2018 | 10/24/2018 | 10/25/2018 7:18:41 AM | P | PASS |
|
|
Lobby hard lid drops at restroom and sales office. Call Adam when heading to site. Thanks AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD18-02235
| BLD-Framing/Rough-in | 10/24/2018 | 10/24/2018 | 10/24/2018 2:09:42 PM | P | PART |
|
|
liza Phone #: ###-#### C/N on site ok to insulate
|
BLD17-04465
| BLD-Wall Bracing | 10/24/2018 | 10/24/2018 | 10/24/2018 2:09:01 PM | P | PASS |
|
|
Exterior shear inspection on south and east walls Phone #: ###-#### Inspection requested via web by Hunter Gomez
|
BLD18-01760
| BLD-Ceiling Grid Inspection | 10/24/2018 | 10/24/2018 | 10/24/2018 12:14:53 PM | A | PASS |
|
|
Derek Phone #: ###-####
|
BLD17-04413
| BLD-Framing/Rough-in | 10/23/2018 | 10/24/2018 | 10/24/2018 12:14:39 PM | A | PASS |
|
|
Roddy Phone #: ###-####
|
BLD17-03016
| BLD-Framing/Rough-in | 10/23/2018 | 10/24/2018 | 10/24/2018 12:14:27 PM | A | PASS |
|
|
Keith Phone #: ###-####
|