PLM19-04515
| Water Heater Final | 10/23/2019 | 10/24/2019 | 10/24/2019 3:22:48 PM | P | PASS |
|
|
Please call Craig Revier about 20-30 minutes prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
PLM19-04138
| Final | 10/23/2019 | 10/24/2019 | 10/24/2019 2:59:39 PM | P | PART |
|
|
BRECK IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER Temp occ ok. 1. Install backfow to coffee machines and possibly the water filter in the breakroom. 2. Lower the drain at the breakroom sink to make a legal connection on the continuous waste.
|
PLM19-03675
| Final | 10/23/2019 | 10/24/2019 | 10/24/2019 2:17:38 PM | P | PASS |
|
|
BRECK IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
PLM19-04580
| Water and/or Sewer | 10/24/2019 | 10/24/2019 | 10/24/2019 1:57:15 PM | P | PART |
|
|
pressure test. pt ok. There is no backflow installed and the system is under pressure. Stacey out of office. WB Super states that they have approval until November 1st to run w/o double check
|
PLM19-03317
| Final | 10/24/2019 | 10/24/2019 | 10/24/2019 1:27:28 PM | P | FAIL |
|
|
juan Phone #: ###-#### 1. An 1-1/2" airgap is required for the water heater t&p.
2. Install a tempering valve on the public lav
|
PLM19-02833
| Final | 10/23/2019 | 10/24/2019 | 10/24/2019 12:59:33 PM | P | PASS |
|
|
Mait Phone #: ###-#### Inspection requested via web by Jerry Downer
|
PLM19-04571
| Water and/or Sewer | 10/23/2019 | 10/24/2019 | 10/24/2019 12:12:47 PM | A | PASS |
|
|
JOHN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Sewer enters 1111 Broadway which is tenant space north of 1115. Grease Interceptor may be required for new tenant of 1115.
|
PLM19-04572
| Water and/or Sewer | 10/23/2019 | 10/24/2019 | 10/24/2019 12:05:51 PM | A | PASS |
|
|
JOHN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER The new sewer enters 1111 and also feeds 1115. Ok to cover.
|
PLM19-04580
| Water and/or Sewer | 10/24/2019 | 10/24/2019 | 10/24/2019 10:13:06 AM | A | PART |
|
|
phase one temp occ ok Dan
|
PLM19-04541
| Pressure Test | 10/23/2019 | 10/24/2019 | 10/23/2019 3:36:05 PM | A | PASS |
|
|
Bill Phone #: ###-#### 20# pass
|