PLM95-01423
| INSP - Water softener | 10/25/1995 | 10/25/1995 | 10/25/1995 12:00:00 AM | | PASS |
|
|
/ / 347 -
|
PLM95-01428
| INSP - Framing/ Rough-in | 10/25/1995 | 10/25/1995 | 10/25/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - CORRECTION MADE O/K W/C 2 BASIN 2 TUB 1 SINK 1 A/W 1 W/H 1
|
PLM95-00304
| INSP - Final | 10/25/1995 | 10/25/1995 | 10/25/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - w/c 4 basin 5 tub 3 shr 1 sink 1 a/w 1 w/h 1
|
PLM95-01441
| INSP - Sprinkler & Backflow | 10/24/1995 | 10/25/1995 | 10/25/1995 12:00:00 AM | A | PASS |
|
|
10/24/95 347 -
|
PLM95-01444
| INSP - Plumbing Rough-in | 10/24/1995 | 10/25/1995 | 10/25/1995 12:00:00 AM | A | PASS |
|
|
10/24/95 347 - FIRST AND SECOND FLOOR BATHROOM GROUPS - SINK TOILETS, UR xxxxxxxxxxxxxx r/i o/k 10/25 by 347 xxxxxxxxxxxxxxxxx
|
PLM95-01447
| INSP - Sprinkler & Backflow | 10/25/1995 | 10/25/1995 | 10/25/1995 12:00:00 AM | P | PASS |
|
|
10/25/95 347 -
|
PLM95-01448
| INSP - Plumbing Rough-in | 10/25/1995 | 10/25/1995 | 10/25/1995 12:00:00 AM | P | PASS |
|
|
10/25/95 347 - 9 FIXTURES IN ALL XXXXXXXXXXXXXXXXX 10 FIXTURES XXXXXXXXXXXXXXXXX W/C 2 BASIN 2 TUB 2 SINKS 2 A/W 1 W/H 1
|
PLM95-01089
| INSP - Final | 10/25/1995 | 10/25/1995 | 10/25/1995 12:00:00 AM | P | PASS |
|
|
10/25/95 347 - W/C 2 BASIN 2 TUB 1 SHR 1 SINK 1 A/W 1 W/H 1
|