ELE99-03666
| Electrical Rough-In | 10/22/1999 | 10/25/1999 | 10/25/1999 12:00:00 AM | A | PART |
|
|
between 8:30 and 9:00 as per pat dave ###-#### Conf. Only
|
ELE99-03782
| Final | 10/22/1999 | 10/25/1999 | 10/25/1999 12:00:00 AM | A | FAIL |
|
|
bob ###-#### fn insp Unused openings
|
ELE99-02481
| Final | 10/22/1999 | 10/25/1999 | 10/25/1999 12:00:00 AM | A | FAIL |
|
|
bob scott ###-#### 250-66
|
ELE99-03775
| Temporary Service | 10/22/1999 | 10/25/1999 | 10/25/1999 12:00:00 AM | A | FAIL |
|
|
DAVE ###-#### TEMP POLE 350-66 #4 bonding 110-12 unused openings 250-64 splice in GEC
|
ELE99-02877
| Electrical Rough-In | 10/25/1999 | 10/25/1999 | 10/25/1999 12:00:00 AM | P | FAIL |
|
|
lower level exterior main level kelly ###-#### Emt. Support and degrees of bend.
|
ELE99-03398
| Final | 10/25/1999 | 10/25/1999 | 10/25/1999 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 10/25/1999 at 08:21:37. Contact: ###-####. Not ready
|
ELE99-03767
| Electrical Rough-In | 10/20/1999 | 10/25/1999 | 10/25/1999 12:00:00 AM | P | FAIL |
|
|
HOMEOWNER RHONDA ###-#### R/I AFTER 3:30 300-4 protection of conductors 210-52 required outlets.
|
ELE99-03435
| Permanent Service | 10/21/1999 | 10/25/1999 | 10/25/1999 12:00:00 AM | P | FAIL |
|
|
MARV ###-#### REINSPECT 370-28 & insulated bushing.
|