Inspections for the day of: Wednesday, October 25, 2000.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Arcoraci
TitleBLD-COM/RES INSPECTOR
Phone #794-9368
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02888 BLD-Framing/Rough-in10/24/200010/25/200010/25/2000 12:00:00 AMAFAIL
FR INSP- MIKE- ###-#### 10/25/2000 9:24:54 AM nail panels get elec ri 10/25/2000 9:25:21 AM
MEC00-03020 Final10/24/200010/25/200010/25/2000 12:00:00 AMAPASS
FN- DEANNE -KEY IN A/C BOX --###-####
MEC00-03325 Final10/24/200010/25/200010/25/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 10/24/2000 at 12:05:27. Contact: ###-####. cn issued 10/25/2000 10:47:05 AM
BLD00-02015 BLD-Framing/Rough-in10/24/200010/25/200010/25/2000 12:00:00 AMAPART
###-#### ok to side 10/25/2000 9:59:10 AM
MEC00-03549 Final10/24/200010/25/200010/25/2000 12:00:00 AMANH
###-#### no ans on phone 10/25/2000 10:11:13 AM
BLD00-02111 BLD-Final10/25/200010/25/200010/25/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/25/2000 at 09:38:23. Contact: ###-####.
BLD00-02401 BLD-Framing/Rough-in10/25/200010/25/200010/25/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 10/25/2000 at 09:39:33. Contact: ###-####. 10/25/2000 4:57:02 PM 1 hr walls wip 10/25/2000 4:58:58 PM
BLD00-02402 BLD-Framing/Rough-in10/25/200010/25/200010/25/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 10/25/2000 at 09:40:39. Contact: ###-####. 1 hr walls wip 10/25/2000 4:58:43 PM
MIS00-00248 BLD-Conference10/25/200010/25/200010/25/2000 12:00:00 AMPPASS
Contact Nathan @ ###-#### for access prior to inspection. 7500 bond 10/25/2000 3:54:53 PM