BLD01-01890
| FIRE-Sprinkler Rough-in | 10/25/2001 | 10/25/2001 | 10/26/2001 12:00:00 AM | P | PASS |
|
|
###-#### GREG okay to cover 10/26/2001 11:25:53 AM
|
BLD00-01481
| FIRE-Conference | 10/24/2001 | 10/25/2001 | 10/25/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/24/2001 at 15:05:03. Contact: ###-####. final inspection requirements with gc 10/25/2001 9:58:09 AM
|
FIR01-00395
| INSP-Sprinkler Rough-in/Hydro | 10/24/2001 | 10/25/2001 | 10/25/2001 12:00:00 AM | A | NR |
|
|
###-#### BECKY
|
FIR01-00513
| INSP-Sprinkler Rough-in | 10/24/2001 | 10/25/2001 | 10/25/2001 12:00:00 AM | P | PART |
|
|
###-#### BECKY riser not complete; overhead per plans 10/25/2001 3:22:16 PM
|
FIR00-00405
| INSP-Sprinkler Rough-in/Hydro | 10/25/2001 | 10/25/2001 | 10/25/2001 12:00:00 AM | P | PART |
|
|
###-#### basement dry system hydro okay 10/25/2001 2:28:08 PM
|
BLD00-02920
| FIRE-Conference | 10/25/2001 | 10/25/2001 | 10/25/2001 12:00:00 AM | P | PART |
|
|
FIRE STOPS PENATRATION HUGO ###-#### okay to proceed with cover; insulation installed 10/25/2001 4:10:28 PM
|
FIR01-00550
| INSP-Sprinkler Rough-in/Hydro | 10/24/2001 | 10/25/2001 | 10/25/2001 12:00:00 AM | P | PART |
|
|
###-#### BECKY another 8o feet of underground completed to building; okay to cover 10/25/2001 1:35:39 PM
|
FIR01-00395
| INSP-Supply line flush | 10/24/2001 | 10/25/2001 | 10/25/2001 12:00:00 AM | P | PASS |
|
|
###-#### BECKY
|