ELE01-01532
| Final | 10/22/2002 | 10/25/2002 | 10/25/2002 12:00:00 AM | A | CANC |
|
|
had a partial fn insp??postcard- cori- ###-#### call 1st before insp
|
ELE02-03318
| Permanent Service | 10/24/2002 | 10/25/2002 | 10/25/2002 12:00:00 AM | A | PART |
|
|
###-#### ready at 10:30
P/S O/H R Ok
check access to water bond and dryer ckt 10/25/2002 11:07:49 AM
|
ELE02-03308
| Electrical Rough-In | 10/24/2002 | 10/25/2002 | 10/25/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
ELE02-03169
| Rough-In Permanent Service | 10/24/2002 | 10/25/2002 | 10/25/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/24/2002 at 11:43:47. Contact: ###-####.Undersized GEC to 200a disconnect 10/25/2002 9:41:19 AM
|
ELE02-03277
| Temporary Service | 10/24/2002 | 10/25/2002 | 10/25/2002 12:00:00 AM | A | FAIL |
|
|
GORDEN ###-####
correction not made 10/25/2002 8:57:13 AM
|
ELE02-02758
| Electrical Rough-In | 10/24/2002 | 10/25/2002 | 10/25/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/24/2002 at 13:36:34. Contact: ###-####.
Ok to cover ceiling except where makeup is required. 10/25/2002 10:10:45 AM
|
ELE02-03105
| Electrical Rough-In | 10/25/2002 | 10/25/2002 | 10/25/2002 12:00:00 AM | P | PART |
|
|
###-#### Jackie (cover)
U/G and office walls ok 10/25/2002 3:15:01 PM
|
ELE02-03335
| Temporary Service | 10/25/2002 | 10/25/2002 | 10/25/2002 12:00:00 AM | P | FAIL |
|
|
chris ###-####
110.12 Mechanical Execution of Work.
(C) Integrity of Electrical Equipment and Connections. Internal parts of electrical equipment, ……. shall not be damaged or contaminated
250.92 Services.
(A) Bonding of Services. The non-current-carrying metal parts of equipment indicated in 250.92(A)(1), (2), and (3) shall be effectively bonded together.
250.53 Grounding Electrode System Installation.
G) Rod and Pipe Electrodes.
where rock bottom is encountered, the electrode shall be driven at an oblique angle not to exceed 45 degrees from the vertical
10/25/2002 1:16:11 PM
|
ELE01-01532
| Final | 10/25/2002 | 10/25/2002 | 10/25/2002 12:00:00 AM | P | PASS |
|
|
|
ELE02-03277
| Temporary Service | 10/25/2002 | 10/25/2002 | 10/25/2002 12:00:00 AM | P | PASS |
|
|
###-####
T/S U/G Ok 10/25/2002 2:19:45 PM
|
ELE02-02982
| Electrical Rough-In | 10/25/2002 | 10/25/2002 | 10/25/2002 12:00:00 AM | P | PASS |
|
|
upher ground ###-####
|