Inspections for the day of: Monday, October 25, 2004.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-01484 BLD-Conference10/21/200410/25/200410/25/2004 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 10/21/2004 at 9:44:54 AM. Contact: ###-####. Met with Rick C. Talked about Special insp and tests from MTI. Rick and Engineer of record have been reviewing Special insp reports.....so far there have been no descrepancies.....Looked at Control Bldg....OK to insulate and Side (steel) Need to have plumbing and HVAC inspection on control Bldg. 10/25/2004 11:15:56 AM
MEC04-02847 Rough-in10/22/200410/25/200410/25/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/22/2004 at 8:18:19 AM. Contact: ###-####.
MEC04-02847 Pressure Test10/22/200410/25/200410/25/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/22/2004 at 8:18:38 AM. Contact: ###-####.
MEC04-02362 Final10/22/200410/25/200410/25/2004 12:00:00 AMAPASS
james; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
MEC04-02846 Rough-in10/22/200410/25/200410/25/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/22/2004 at 5:05:54 PM. Contact: ###-####.
MEC04-02846 Pressure Test10/22/200410/25/200410/25/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/22/2004 at 5:06:10 PM. Contact: ###-####.
MEC04-02552 Final10/22/200410/25/200410/25/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/22/2004 at 5:06:55 PM. Contact: ###-####. 10/25/2004 10:24:53 AM
MEC04-02874 Rough-in10/22/200410/25/200410/25/2004 12:00:00 AMAPASS
Tosha; Phone #: ###-#### Internet Inspection Request from: Mya Matheson
BLD03-02525 BLD-Final10/22/200410/25/200410/25/2004 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Ken Litzinger C/C issued. 10/25/2004 9:22:40 AM
BLD04-02295 BLD-Footing10/25/200410/25/200410/25/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/25/2004 at 7:21:28 AM. Contact: ###-####.
BLD04-02300 BLD-Foundation10/25/200410/25/200410/25/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/25/2004 at 7:23:53 AM. Contact: ###-####.
BLD04-02169 BLD-Framing/Rough-in10/25/200410/25/200410/25/2004 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 10/25/2004 at 7:27:50 AM. C/N 10/25/2004 4:23:49 PM
BLD04-01136 BLD-Final10/25/200410/25/200410/25/2004 12:00:00 AMPPASS
###-#### - ron C/C issued. 10/25/2004 4:24:34 PM
BLD01-02249 BLD-Conference9/23/200410/25/200410/25/2004 12:00:00 AMPPART
Called Scott and left message. Will check back with him. 10/25/2004 4:33:06 PM
BLD04-01969 BLD-Framing/Rough-in10/24/200410/25/200410/25/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/24/2004 at 10:22:24 PM. Contact: ###-####.