Inspections for the day of: Tuesday, October 25, 2005.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00577 INSP-Sprinkler Rough-in10/25/200510/25/200510/25/2005 4:22:29 PMPPART
Overhead rough-in at three hard lid areas in the mezzanine space appear acceptable pending verification with approved plans which are currently under review for resubmittal. Discussed with GC full height wall needed at open ceiling room, coverage under stairs, fire treated wood for flooring, antifreeze loop requirements.
FIR05-00372 INSP-Sprinkler Rough-in/Hydro10/24/200510/25/200510/25/2005 4:00:51 PMPFAIL
Overhead hydrostatic test of theatres and mezzanine off floor control valve south stair lost approx. 2 psi, contractor to have checked tomorrow for re-inspect. Contractor is not ready for overhead rough-in inspection for the shell at this time.
FIR05-00089 INSP-Sprinkler Rough-in/Hydro10/25/200510/25/200510/25/2005 3:27:57 PMPNR
Contractor states all items on correction notice are complete (subject to verification by inspector) except 3 items, no re-inspection performed at this time.
BLD05-00626 FIRE-Final Inspection10/25/200510/25/200510/25/2005 3:24:54 PMPFAIL
Provide three fire extinguishers as discussed, provide tenant address, provide max occupant load signs, provide emergency lighting and exit signs as indicated on approved plans sheet E3.0, emergency lights in two locations are non-functional, provide visual indicator and signage above the main entry/exit doors, storage must be maintained min. 18" below sprinkler deflectors, need fire sprinkler and alarm permits finaled prior to life safety approval.
BLD04-01323 FIRE-Final Inspection10/25/200510/25/200510/25/2005 3:19:30 PMPNR
Several items on the correction notice have not been completed as noticed during the course of a related inspection, no inspection performed. Contacted John the GC for notification of the situation.
FIR05-00459 INSP-Alarm Testing10/24/200510/25/200510/25/2005 3:15:24 PMPFAIL
The duct detectors are installed on the supply side, not return as code requires.
FIR05-00076 INSP-Alarm Testing10/24/200510/25/200510/25/2005 3:13:03 PMPFAIL
North elevator is not functional at this time, need an additional SD above the FACP due to a beam pocket obstruction, clock tower AV is not functional, provide signage at FACP room door, outside bell to be relocated at face of brick, elevator roof damper is not required due to barometric shaft, resubmitt for changed EOL, added devices, deleted damper and revised matrix for pump, provide audibility for the FACP room.
FIR05-00426 INSP-Alarm Testing10/24/200510/25/200510/25/2005 3:07:38 PMAFAIL
Provide resubmittals for added devices, relocated strobe in kitchen, 180 cd strobes outside and EOL changes, verify locations and correct size sample tubes in all duct detectors, provide approved locations for duct detectors and results of the proposed magnahelic test, re-test duct detectors, obtain signal verification, exterior horns are not synched with the inetrior horns.
FIR05-00075 INSP-Alarm Testing10/24/200510/25/200510/25/2005 3:02:15 PMAFAIL
Provide audibility in the FACP room, provide signage at door to FACP room, provide resubmittals for EOL changes and added horn for FACP room, west elevator is not complete yet, provide Knox box with key and map, Foster bld. monitoring and elevator controls are incomplete.
BLD05-01993 FIRE-Final Inspection10/24/200510/25/200510/25/2005 8:29:44 AMAPASS
The fire sprinkler issues have been corrected, fire life safety finaled.
FIR05-00521 INSP-Final Inspection10/25/200510/25/200510/25/2005 12:00:00 AMAPASS
Corrections have been made and resubmittals verified, fire sprinkler finaled.