FIR05-00645
| INSP-Final Inspection | 10/25/2005 | 10/25/2005 | 10/25/2005 5:07:44 PM | P | CANC |
|
|
Plans are still in the resubmittal process
|
FIR05-00559
| INSP-Final Inspection | 10/25/2005 | 10/25/2005 | 10/25/2005 4:16:20 PM | P | FAIL |
|
|
Strobes are not synced, end of line voltage did not meet the 21.6 required (was 18.012), need to retest the east duct smoke detector since it did not want to latch when first tested and need updated map at the facp
|
FIR05-00626
| INSP-Sprinkler Rough-in | 10/25/2005 | 10/25/2005 | 10/25/2005 4:14:13 PM | P | FAIL |
|
|
Upright heads missing from existing branchline on the entrance side of the columns and three heads are missing from the west side wall in the occupied tenant space. Front soffit is ok to cover.
|
FIR05-00447
| INSP-Sprinkler Rough-in/Hydro | 10/24/2005 | 10/25/2005 | 10/25/2005 4:12:32 PM | P | PASS |
|
|
24 hour hydro test passed. Sprinkler rough-in for the southwest dry system (area above insulation) passed.
|
BLD05-01576
| FIRE-Final Inspection | 10/24/2005 | 10/25/2005 | 10/25/2005 4:11:15 PM | P | PASS |
|
|
Fire life safety finaled
|
FIR05-00671
| INSP-Sprinkler Rough-in | 10/24/2005 | 10/25/2005 | 10/25/2005 10:27:39 AM | A | FAIL |
|
|
Plans do not show the flex heads that have been used. No inspection done. Resubmit plans showing flexheads.
|
FIR05-00506
| INSP-Sprinkler Rough-in/Hydro | 10/24/2005 | 10/25/2005 | 10/25/2005 10:23:37 AM | A | PART |
|
|
Sprinkler piping is ok to cover. See city approved plans for locations of deficiencies which include hydraulic calculations due to an additional head added in a pocket
|
FIR05-00568
| INSP-Final Inspection | 10/24/2005 | 10/25/2005 | 10/25/2005 10:00:33 AM | A | PASS |
|
|
Hood suppression system operated correctly
|