Inspections for the day of: Tuesday, October 25, 2005.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00645 INSP-Final Inspection10/25/200510/25/200510/25/2005 5:07:44 PMPCANC
Plans are still in the resubmittal process
FIR05-00559 INSP-Final Inspection10/25/200510/25/200510/25/2005 4:16:20 PMPFAIL
Strobes are not synced, end of line voltage did not meet the 21.6 required (was 18.012), need to retest the east duct smoke detector since it did not want to latch when first tested and need updated map at the facp
FIR05-00626 INSP-Sprinkler Rough-in10/25/200510/25/200510/25/2005 4:14:13 PMPFAIL
Upright heads missing from existing branchline on the entrance side of the columns and three heads are missing from the west side wall in the occupied tenant space. Front soffit is ok to cover.
FIR05-00447 INSP-Sprinkler Rough-in/Hydro10/24/200510/25/200510/25/2005 4:12:32 PMPPASS
24 hour hydro test passed. Sprinkler rough-in for the southwest dry system (area above insulation) passed.
BLD05-01576 FIRE-Final Inspection10/24/200510/25/200510/25/2005 4:11:15 PMPPASS
Fire life safety finaled
FIR05-00671 INSP-Sprinkler Rough-in10/24/200510/25/200510/25/2005 10:27:39 AMAFAIL
Plans do not show the flex heads that have been used. No inspection done. Resubmit plans showing flexheads.
FIR05-00506 INSP-Sprinkler Rough-in/Hydro10/24/200510/25/200510/25/2005 10:23:37 AMAPART
Sprinkler piping is ok to cover. See city approved plans for locations of deficiencies which include hydraulic calculations due to an additional head added in a pocket
FIR05-00568 INSP-Final Inspection10/24/200510/25/200510/25/2005 10:00:33 AMAPASS
Hood suppression system operated correctly