Inspections for the day of: Thursday, October 25, 2007.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-00733 BLD-Final10/25/200710/25/200710/25/2007 4:23:14 PMPNR
Internet Inspection Request from: James Greenwood need code inforcement final
BLD06-00693 BLD-Framing/Rough-in10/24/200710/25/200710/25/2007 4:22:25 PMAPART
Scheduled by a contractor via Hello! on 10/24/2007 at 5:28:28 PM. Contact: ###-####.first and second floor ok to insulate
BLD07-01438 BLD-Framing/Rough-in10/24/200710/25/200710/25/2007 4:21:31 PMANR
joe Phone #: ###-#### neeeds seal package and truss engineering
BLD07-01437 BLD-Framing/Rough-in10/24/200710/25/200710/25/2007 4:20:30 PMANR
joe Phone #: ###-#### needs seal package and truss engineering
BLD07-01877 BLD-Conference10/24/200710/25/200710/25/2007 4:19:37 PMAPART
rick Note: please call 1/2 hr prior to isnpection Phone #: ###-#### one hr elev and corridor walls plans show that corridor walls are one hr I talked with carral about this bld had same issuse on other floors becouse of fire sprinkler system corridors not required to be onr hr
BLD06-01759 BLD-Final10/24/200710/25/200710/25/2007 10:15:27 AMAPASS
Scheduled by a contractor via Hello! on 10/24/2007 at 9:01:13 PM. Contact: ###-####.
BLD06-01759 DOC - Permit Finaled10/25/200710/25/200710/25/2007 10:15:14 AMPPASS
BLD07-02496 BLD-Foundation10/24/200710/25/200710/25/2007 9:55:41 AMACANC
Ben ###-####