ESC10-00657
| General Inspection | 10/22/2010 | 10/25/2010 | 10/25/2010 11:37:11 AM | A | PART |
|
|
Inspect post rain event-status of site? Site withstood the .6 inches of rain well, no runoff problems observed. Informed RP that the rock entrance needs a top dressing of basalt rock to reduce tracking to achieve MEP. As well, with higher moisture content this is a ideal time to trackwalk the slopes. Overall site is ok.
|