BLD11-00693
| FIRE-Final Inspection | 10/25/2011 | 10/25/2011 | 10/26/2011 3:49:28 PM | P | NR |
|
|
|
BLD10-02771
| FIRE-Supply Line Flush | 10/25/2011 | 10/25/2011 | 10/26/2011 3:48:53 PM | P | PART |
|
|
|
BLD11-02560
| FIRE-Final Inspection | 10/24/2011 | 10/25/2011 | 10/26/2011 10:05:57 AM | P | PASS |
|
|
Fire life safety finaled.
|
BLD11-02561
| FIRE-Final Inspection | 10/24/2011 | 10/25/2011 | 10/26/2011 10:05:24 AM | P | PASS |
|
|
Fire life safety inspection passed.
|
FIR08-00764
| FIR-Aging Inspection | 10/25/2011 | 10/25/2011 | 10/25/2011 2:16:42 PM | | FAIL |
|
|
|
FIR07-00372
| FIR-Aging Inspection | 10/25/2011 | 10/25/2011 | 10/25/2011 2:15:49 PM | | DONE |
|
|
Construction suspended.
|
FIR07-00371
| FIR-Aging Inspection | 10/25/2011 | 10/25/2011 | 10/25/2011 2:14:38 PM | | DONE |
|
|
Site construction suspended.
|
FIR11-00367
| INSP-Final Inspection | 10/24/2011 | 10/25/2011 | 10/25/2011 2:13:28 PM | A | PASS |
|
|
Fire sprinkler permit final approved.
|
FIR11-00367
| INSP-Sprinkler Rough-in | 10/24/2011 | 10/25/2011 | 10/25/2011 2:12:28 PM | A | PART |
|
|
Overhead rough-in approved for cover at the drop ceilings. Pre-inspection done under project related building permit.
|
FIR11-00023
| INSP-Final Inspection | 10/24/2011 | 10/25/2011 | 10/25/2011 2:10:22 PM | A | PART |
|
|
Verified temporary partitions have been removed. Added heads at the open areas adjacent to the new remodel okayed. Final pending installation of the remainder of ceiling tile and escutcheons.
|
BLD11-02487
| FIRE-Final Inspection | 10/24/2011 | 10/25/2011 | 10/25/2011 2:06:55 PM | A | PASS |
|
|
C/N items verified for completion. Fire life safety finaled.
|