BLD13-02172
| BLD-Framing/Rough-in | 10/25/2013 | 10/25/2013 | 10/26/2013 7:27:03 AM | P | NR |
|
|
Phone #: ###-#### >> Inspection requested via web by Dan Geis,, needs mech 1st
|
BLD13-02470
| BLD-Framing/Rough-in | 10/24/2013 | 10/25/2013 | 10/26/2013 7:26:28 AM | P | PASS |
|
|
Todd Phone #: ###-####
|
ESC13-00600
| Site Preparation | 10/25/2013 | 10/25/2013 | 10/25/2013 4:12:38 PM | P | PASS |
|
|
|
BLD13-01883
| BLD-Final | 10/25/2013 | 10/25/2013 | 10/25/2013 4:11:50 PM | P | FAIL |
|
|
Paul Phone #: ###-####,, need hand rails and guard rails to meet code,, all else ok
|
BLD13-01573
| BLD-Footing | 10/25/2013 | 10/25/2013 | 10/25/2013 3:55:56 PM | P | PASS |
|
|
Dan Phone #: ###-####
|
BLD13-01071
| BLD-Final | 10/24/2013 | 10/25/2013 | 10/25/2013 3:06:19 PM | P | PASS |
|
|
PJ Smith Phone #: ###-####
|
BLD13-01071
| DOC - Permit Finaled | 10/25/2013 | 10/25/2013 | 10/25/2013 3:05:52 PM | P | PASS |
|
|
done
|
BLD13-01757
| BLD-Framing/Rough-in | 10/24/2013 | 10/25/2013 | 10/25/2013 3:04:34 PM | P | PART |
|
|
Lock box code 1424. Phone #: ###-#### >> Inspection requested via web by brandon waltman,, frame ok,, ok to insulate,, need to seal the top of the basement fire place where the plumbers cut out the fire block
|
BLD12-01630
| BLD-Framing/Rough-in | 10/24/2013 | 10/25/2013 | 10/25/2013 1:13:31 PM | A | PASS |
|
|
David Phone #: ###-####,, need a fix on 3 ply truss,, drilled for plumbing,, bearing location,, ok to insulate
|
GCB13-00120
| GCB-Energy | 10/24/2013 | 10/25/2013 | 10/25/2013 12:08:05 PM | A | PASS |
|
|
Brandon ###-#### Call one hour before
|