BLD16-03818
| BLD-Final | 10/25/2016 | 10/25/2016 | 10/25/2016 4:06:50 PM | P | PASS |
|
|
Steve Phone #: ###-####. ok for perm occ.
|
BLD16-02953
| BLD-Foundation | 10/25/2016 | 10/25/2016 | 10/25/2016 3:23:15 PM | P | PASS |
|
|
Scott-rebar-pour time 3:00 Phone #: ###-####
|
BLD16-02952
| BLD-Foundation | 10/25/2016 | 10/25/2016 | 10/25/2016 3:23:02 PM | P | PASS |
|
|
Scott-rebar-pour time 3:00 Phone #: ###-####
|
BLD15-02837
| BLD-Conference | 10/25/2016 | 10/25/2016 | 10/25/2016 3:04:56 PM | P | DONE |
|
|
Richard Phone #: ###-####
|
BLD16-03484
| BLD-Energy code compliance | 10/25/2016 | 10/25/2016 | 10/25/2016 3:02:16 PM | P | PASS |
|
|
Rigid insulation at interior side of stemwall ok.
|
BLD16-02720
| BLD-Foundation | 10/24/2016 | 10/25/2016 | 10/25/2016 2:18:35 PM | P | PART |
|
|
Wall pour is Wednesday 830am // Larry Phone #: ###-####. Work in progress, loading dock wall. Will have special inspection.
|
ESC16-01219
| Site Preparation | 10/25/2016 | 10/25/2016 | 10/25/2016 1:31:32 PM | P | PASS |
|
|
|
BLD16-03216
| BLD-Footing | 10/24/2016 | 10/25/2016 | 10/25/2016 1:31:06 PM | P | PART |
|
|
Dane Phone #: ###-####
|
BLD16-01759
| BLD-Footing | 10/24/2016 | 10/25/2016 | 10/25/2016 11:56:28 AM | A | PASS |
|
|
Cameron-stair case Phone #: ###-####
|
BLD16-03697
| BLD-Wall Bracing | 10/24/2016 | 10/25/2016 | 10/25/2016 10:02:01 AM | A | PASS |
|
|
Zane Phone #: ###-####
|
BLD16-03484
| BLD-Energy code compliance | 10/24/2016 | 10/25/2016 | 10/25/2016 9:33:07 AM | A | NR |
|
|
Insulation // Dante Phone #: ###-####. Provide additional insulation at footings were they step down. Need 24 inches min.
|
BLD16-03461
| BLD-Footing | 10/25/2016 | 10/25/2016 | 10/25/2016 9:29:45 AM | P | CANC |
|
|
Inspection cancelled from web by: rich prasch
|
BLD16-03461
| BLD-Footing | 10/24/2016 | 10/25/2016 | 10/25/2016 9:29:35 AM | A | CANC |
|
|
This footing inspection can be done late AM or early PM. Jimmy will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### >> Inspection requested via web by rich prasch Inspection cancelled from web by: rich prasch
|
BLD16-03242
| BLD-Concrete | 10/24/2016 | 10/25/2016 | 10/25/2016 9:14:16 AM | A | PART |
|
|
second 8 foot grout lift @ 11am. Phone #: ###-#### Inspection requested via web by Todd Landvatter. Work in progress for elevator shaft, 8ft. to 16ft. elevation, special inspector will be on site.
|
BLD16-03666
| BLD-Footing | 10/24/2016 | 10/25/2016 | 10/25/2016 8:49:46 AM | A | CANC |
|
|
Herb-pour time 8:30 AM Phone #: ###-####
|
BLD16-03666
| BLD-Energy code compliance | 10/25/2016 | 10/25/2016 | 10/25/2016 8:49:39 AM | A | PASS |
|
|
Herb-pour time 8:30 AM Phone #: ###-####. Rigid insulation, at stemwall,interior side, under slab on grade at Footings for south courtyard, east exterior footing, south exterior footing and approx. 25 l.f. of south west exterior footing ok.
|
BLD16-03666
| BLD-Foundation | 10/25/2016 | 10/25/2016 | 10/25/2016 8:48:02 AM | A | PASS |
|
|
Herb-pour time 8:30 AM Phone #: ###-####. Footings for south courtyard, east exterior footing, south exterior footing and approx. 25 l.f. of south west exterior footing ok. Special inspector on site.
|