Inspections for the day of: Tuesday, October 25, 2016.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-03818 BLD-Final10/25/201610/25/201610/25/2016 4:06:50 PMPPASS
Steve Phone #: ###-####. ok for perm occ.
BLD16-02953 BLD-Foundation10/25/201610/25/201610/25/2016 3:23:15 PMPPASS
Scott-rebar-pour time 3:00 Phone #: ###-####
BLD16-02952 BLD-Foundation10/25/201610/25/201610/25/2016 3:23:02 PMPPASS
Scott-rebar-pour time 3:00 Phone #: ###-####
BLD15-02837 BLD-Conference10/25/201610/25/201610/25/2016 3:04:56 PMPDONE
Richard Phone #: ###-####
BLD16-03484 BLD-Energy code compliance10/25/201610/25/201610/25/2016 3:02:16 PMPPASS
Rigid insulation at interior side of stemwall ok.
BLD16-02720 BLD-Foundation10/24/201610/25/201610/25/2016 2:18:35 PMPPART
Wall pour is Wednesday 830am // Larry Phone #: ###-####. Work in progress, loading dock wall. Will have special inspection.
ESC16-01219 Site Preparation10/25/201610/25/201610/25/2016 1:31:32 PMPPASS
BLD16-03216 BLD-Footing10/24/201610/25/201610/25/2016 1:31:06 PMPPART
Dane Phone #: ###-####
BLD16-01759 BLD-Footing10/24/201610/25/201610/25/2016 11:56:28 AMAPASS
Cameron-stair case Phone #: ###-####
BLD16-03697 BLD-Wall Bracing10/24/201610/25/201610/25/2016 10:02:01 AMAPASS
Zane Phone #: ###-####
BLD16-03484 BLD-Energy code compliance10/24/201610/25/201610/25/2016 9:33:07 AMANR
Insulation // Dante Phone #: ###-####. Provide additional insulation at footings were they step down. Need 24 inches min.
BLD16-03461 BLD-Footing10/25/201610/25/201610/25/2016 9:29:45 AMPCANC
Inspection cancelled from web by: rich prasch
BLD16-03461 BLD-Footing10/24/201610/25/201610/25/2016 9:29:35 AMACANC
This footing inspection can be done late AM or early PM. Jimmy will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### >> Inspection requested via web by rich prasch Inspection cancelled from web by: rich prasch
BLD16-03242 BLD-Concrete10/24/201610/25/201610/25/2016 9:14:16 AMAPART
second 8 foot grout lift @ 11am. Phone #: ###-#### Inspection requested via web by Todd Landvatter. Work in progress for elevator shaft, 8ft. to 16ft. elevation, special inspector will be on site.
BLD16-03666 BLD-Footing10/24/201610/25/201610/25/2016 8:49:46 AMACANC
Herb-pour time 8:30 AM Phone #: ###-####
BLD16-03666 BLD-Energy code compliance10/25/201610/25/201610/25/2016 8:49:39 AMAPASS
Herb-pour time 8:30 AM Phone #: ###-####. Rigid insulation, at stemwall,interior side, under slab on grade at Footings for south courtyard, east exterior footing, south exterior footing and approx. 25 l.f. of south west exterior footing ok.
BLD16-03666 BLD-Foundation10/25/201610/25/201610/25/2016 8:48:02 AMAPASS
Herb-pour time 8:30 AM Phone #: ###-####. Footings for south courtyard, east exterior footing, south exterior footing and approx. 25 l.f. of south west exterior footing ok. Special inspector on site.