MEC18-05093
| Final | 10/24/2018 | 10/25/2018 | 10/25/2018 4:17:20 PM | P | FAIL |
|
|
If possible, please call home owner one hour before at ###-####. Thank you. Phone #: ###-#### Inspection requested via web by James Cox- R/A plenum needs insulated in garage- filter door needs clips on it to secure door
|
MEC18-02949
| Final | 10/25/2018 | 10/25/2018 | 10/25/2018 3:17:26 PM | P | PASS |
|
|
Inspection requested via web by Sam Brown- final ok
|
MEC18-02948
| Final | 10/25/2018 | 10/25/2018 | 10/25/2018 3:17:03 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown- final ok
|
MEC18-05141
| Rough-in | 10/25/2018 | 10/25/2018 | 10/25/2018 1:58:52 PM | P | PART |
|
|
Need ok partial for bathrooms Inspection requested via web by Floyd Floyd Peek- R/I on 2 bathrooms ok- drawings show ducted returns but whats installed is plenum need to check with engineers on this- call in inspection when all rough in for duct is ready
|
MEC18-03232
| Final | 10/24/2018 | 10/25/2018 | 10/25/2018 1:30:31 PM | P | PASS |
|
|
Dale Phone #: ###-####- final ok
|
MEC18-03231
| Final | 10/24/2018 | 10/25/2018 | 10/25/2018 1:30:06 PM | P | PASS |
|
|
Dale Phone #: ###-####- final ok
|
MEC18-05144
| Pressure Test | 10/25/2018 | 10/25/2018 | 10/25/2018 11:11:40 AM | P | CANC |
|
|
installer ANAS - ###-#### Phone #: ###-#### >> Inspection requested via web by Aaron Alandt Inspection cancelled from web by: Aaron Alandt
|
MEC18-04061
| Final | 10/24/2018 | 10/25/2018 | 10/25/2018 10:31:30 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Robin Cox- final ok- card signed
|
MEC18-05114
| Final | 10/25/2018 | 10/25/2018 | 10/25/2018 9:16:27 AM | A | PASS |
|
|
co installed
|
MEC18-05114
| Pressure Test | 10/24/2018 | 10/25/2018 | 10/25/2018 9:13:55 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Michael Stimpson- 20lb gas pass whole system- free standing gas stove was installed at manufactures home plant when originally installed per phone conversation with homeowner
|
MEC18-05000
| Final | 10/18/2018 | 10/25/2018 | 10/25/2018 8:50:10 AM | A | PASS |
|
|
Please call Matt at ###-#### when in route Phone #: ###-#### Inspection requested via web by Sabrina DeHority- furnace only gas pressure test and flue test co ok
|
MEC18-05000
| Pressure Test | 10/18/2018 | 10/25/2018 | 10/25/2018 8:49:28 AM | A | PASS |
|
|
Please call Matt at ###-#### when in route Phone #: ###-#### Inspection requested via web by Sabrina DeHority- 20lb gas pass- 5lb flue pass
|
MEC17-03780
| Mec-Aging Inspection | 10/25/2018 | 10/25/2018 | 10/25/2018 8:04:09 AM | | FAIL |
|
|
no calls for inspection- homeowner needs to call in for permit to be extended- bldg permit still open
|
MEC18-04949
| Final | 10/24/2018 | 10/25/2018 | 10/24/2018 4:03:34 PM | P | CANC |
|
|
meet homeowner at 400 pm-
|
MEC18-04900
| Final | 10/22/2018 | 10/25/2018 | 10/23/2018 10:18:02 AM | A | CANC |
|
|
Please call Jesse Jones at ###-#### prior to arrival. Phone #: ###-#### >> Inspection requested via web by Andrea Grigsby Inspection cancelled from web by: Andrea Grigsby
|