PLM19-04345
| Water Softner Final | 10/21/2019 | 10/25/2019 | 10/25/2019 10:09:17 AM | A | PASS |
|
|
PLEASE CALL TECH BRIAN WHEN ON THE WAY. THANK YOU Phone #: ###-#### Inspection requested via web by Chris Field
|
PLM19-02265
| Groundwork | 10/24/2019 | 10/25/2019 | 10/25/2019 9:31:39 AM | A | FAIL |
|
|
Please call Dave at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum 1. Piping in and out of the interceptor ok. 2. A plumbing permit is required for the installation of the interceptor. 3. A water 24 hour water test is required for the interceptor including all sides exposed
|