Inspections for the day of: Monday, October 26, 1998.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC98-03098 INSP - Final10/26/199810/26/199810/27/1998 12:00:00 AMPFAIL
10/26/98 316 - C/N...Prot post, wrap boots.....
MEC98-03098 INSP - Final10/26/199810/26/199810/27/1998 12:00:00 AMPFAIL
10/26/98 316 - C/N...Prot post, wrap boots.....
MEC98-03238 INSP - Final10/26/199810/26/199810/27/1998 12:00:00 AMPFAIL
10/26/98 316 - C/N...Range hood duct damper when open, blocks duct....
MEC98-03238 INSP - Final10/26/199810/26/199810/27/1998 12:00:00 AMPFAIL
10/26/98 316 - C/N...Range hood duct damper when open, blocks duct....
MEC98-03535 INSP - Framing/ Rough-in10/26/199810/26/199810/27/1998 12:00:00 AMPPASS
10/26/98 316 - Scheduled by Hello!. Contact phone is [3751100].
BLD98-01661 INSP - Energy code compliance10/24/199810/26/199810/27/1998 12:00:00 AMPPASS
10/26/98 316 - OK Contact phone is [8801636].
BLD98-02172 INSP - Framing/Rough-in10/26/199810/26/199810/27/1998 12:00:00 AMPPART
10/26/98 316 - Shear wall OK
BLD98-02205 INSP - Framing/Rough-in10/23/199810/26/199810/27/1998 12:00:00 AMPPASS
10/26/98 316 - OK
BLD98-02249 INSP - Framing/Rough-in10/26/199810/26/199810/27/1998 12:00:00 AMPFAIL
10/26/98 316 - C/N...Transf point loads....
BLD98-02310 INSP - Final10/23/199810/26/199810/27/1998 12:00:00 AMPPASS
10/26/98 316 - C/C # 014823
BLD98-02374 INSP - Framing/Rough-in10/26/199810/26/199810/27/1998 12:00:00 AMPFAIL
10/26/98 316 - C/N....shear panel insp Complete per Engineering.....
BLD98-02586 INSP - Framing/Rough-in10/26/199810/26/199810/27/1998 12:00:00 AMPFAIL
10/26/98 316 - NR....... Contact phone is [8507182].
BLD98-02996 INSP - Concrete10/26/199810/26/199810/27/1998 12:00:00 AMPPASS
10/26/98 316 - Ft insp OK
BLD98-00853 INSP - Energy code compliance10/26/199810/26/199810/26/1998 12:00:00 AM PASS
/ / 316 -
BLD98-02824 INSP - Framing/ Rough-in10/26/199810/26/199810/26/1998 12:00:00 AM PASS
/ / 316 -
BLD98-02824 INSP - Flatwork10/26/199810/26/199810/26/1998 12:00:00 AM PART
/ / 316 - Slab and slab reinforcment..OK
BLD98-02044 INSP - Final10/26/199810/26/199810/26/1998 12:00:00 AM PASS
/ / 316 - C/C # 014821
BLD98-02126 INSP - Final10/26/199810/26/199810/26/1998 12:00:00 AM PASS
/ / 316 - C/C # 014820
BLD98-01881 INSP - Final10/23/199810/26/199810/26/1998 12:00:00 AMAPASS
10/26/98 316 - C/C # 014822
BLD97-03390 INSP - Final10/23/199810/26/199810/26/1998 12:00:00 AMAFAIL
10/26/98 316 - C/N..All signatures,draftstops,letterEngineer&specinsp,P/
BLD98-03062 INSP - Foundation10/23/199810/26/199810/26/1998 12:00:00 AMAPASS
10/26/98 316 - Footing OK