ELE99-03014
| Final | 10/26/1999 | 10/26/1999 | 10/27/1999 12:00:00 AM | P | PASS |
|
|
FN INSP BUTCH--- ###-####
|
ELE99-02956
| Electrical Rough-In | 10/22/1999 | 10/26/1999 | 10/26/1999 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/22/1999 at 11:52:37. Contact: ###-####. (JMS) Called cor. Posted $42.00 reinspection fee due posted Pat Lass's corrections not made.
|
ELE99-03835
| Final | 10/25/1999 | 10/26/1999 | 10/26/1999 12:00:00 AM | A | FAIL |
|
|
david ###-#### R/I for U/G ok only correction posted see JF for details
|
ELE99-03609
| Final | 10/25/1999 | 10/26/1999 | 10/26/1999 12:00:00 AM | A | PASS |
|
|
CALL ###-#### AND SOMEONE WILL MEET YOU THERE (JMS)
|
ELE99-03445
| Final | 10/25/1999 | 10/26/1999 | 10/26/1999 12:00:00 AM | A | PASS |
|
|
JIMBOB ###-#### (JMS)
|
ELE99-03448
| Electrical Rough-In | 10/26/1999 | 10/26/1999 | 10/26/1999 12:00:00 AM | P | PART |
|
|
steve-- ###-#### r/i
|
ELE99-03505
| Electrical Rough-In | 10/26/1999 | 10/26/1999 | 10/26/1999 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/26/1999 at 10:03:17. Contact: ###-####. P/S meter only
|