BLD99-01963
| BLD-Final | 10/25/1999 | 10/26/1999 | 10/26/1999 12:00:00 AM | A | FAIL |
|
|
SAM --###-#### FN INCP; need other insps
|
BLD99-01785
| BLD-Other | 10/25/1999 | 10/26/1999 | 10/26/1999 12:00:00 AM | A | PART |
|
|
masonary grout mark ###-####; spec insp onsite
|
BLD99-01410
| BLD-Framing/Rough-in | 10/25/1999 | 10/26/1999 | 10/26/1999 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/25/1999 at 12:20:55. Contact: ###-####. C/N; straps, blocking, HD's etc
|
BLD99-02369
| BLD-Final | 10/25/1999 | 10/26/1999 | 10/26/1999 12:00:00 AM | A | PASS |
|
|
JOE ###-#### ###-####PAGER Card to cont.
|
BLD99-02642
| BLD-Framing/Rough-in | 10/25/1999 | 10/26/1999 | 10/26/1999 12:00:00 AM | A | PART |
|
|
dwayne ###-####
|
MEC99-02706
| Final | 10/25/1999 | 10/26/1999 | 10/26/1999 12:00:00 AM | A | FAIL |
|
|
###-#### WENDY OR SKIP CALL FOR ACCESS; c/n: need separate htg system if separate tenants...basement apparently used as apt.
|
BLD99-02652
| BLD-Framing/Rough-in | 10/26/1999 | 10/26/1999 | 10/26/1999 12:00:00 AM | A | PART |
|
|
Has Htg. C/N- ok to "tile" after made ok.
|
BLD99-02724
| BLD-Framing/Rough-in | 10/26/1999 | 10/26/1999 | 10/26/1999 12:00:00 AM | P | PART |
|
|
Add blocking @ joists; ok to continue
|
MEC99-03252
| Rough-in | 10/25/1999 | 10/26/1999 | 10/26/1999 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/25/1999 at 15:40:11. Contact: ###-####.
|
MEC99-03584
| Final | 10/26/1999 | 10/26/1999 | 10/26/1999 12:00:00 AM | P | PASS |
|
|
gilbert ###-#### fn insp--homeowner ###-#### cell-- tyler --FOR GAS TEST W.H./gas line and flue ok
|
BLD99-02981
| BLD-Foundation | 10/26/1999 | 10/26/1999 | 10/26/1999 12:00:00 AM | P | FAIL |
|
|
JED-- ###-#### THEN 20153 CELL -FOUND need eng's as requested
|
BLD98-00098
| BLD-Final | 10/26/1999 | 10/26/1999 | 10/26/1999 12:00:00 AM | P | CANC |
|
|
lynn ###-#### cancelled not ready
|
BLD99-02317
| BLD-Foundation | 10/26/1999 | 10/26/1999 | 10/26/1999 12:00:00 AM | P | PART |
|
|
rebar kent ###-#### Spec. insp. Onsite
|