Inspections for the day of: Thursday, October 26, 2000.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Arcoraci
TitleBLD-COM/RES INSPECTOR
Phone #794-9368
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01953 BLD-Other10/25/200010/26/200010/26/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 10/25/2000 at 10:08:50. Contact: ###-####. wip spec insp on site 10/26/2000 11:02:34 AM
MEC00-02793 Final10/25/200010/26/200010/26/2000 12:00:00 AMANR
Scheduled by a contractor via Hello! on 10/25/2000 at 15:00:08. Contact: ###-####. no access 10/26/2000 10:02:26 AM
MEC00-03631 Pressure Test10/25/200010/26/200010/26/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/25/2000 at 15:01:11. Contact: ###-####.
MEC00-03195 Rough-in10/25/200010/26/200010/26/2000 12:00:00 AMAPASS
Scheduled by Inspector: 415 On 10/25/2000
robin ###-#### 10/25/2000 4:04:21 PM diff missing brabch run installed 10/26/2000 11:02:11 AM
MEC00-03585 Final10/25/200010/26/200010/26/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/25/2000 at 16:01:32. Contact: ###-####.
BLD00-02667 BLD-Framing/Rough-in10/25/200010/26/200010/26/2000 12:00:00 AMAFAIL
###-#### cn issued 10/26/2000 10:43:39 AM
BLD00-00601 BLD-Final10/26/200010/26/200010/26/2000 12:00:00 AMPNR
Jim ###-#### -fire is also going out needs eng letter of acceptance 10/26/2000 2:57:14 PM
BLD00-02551 BLD-Final10/26/200010/26/200010/26/2000 12:00:00 AMPNR
Jim ###-#### fire is also going out
BLD00-01053 BLD-Final10/26/200010/26/200010/26/2000 12:00:00 AMPNR
jim ###-####
BLD00-01600 BLD-Final10/26/200010/26/200010/26/2000 12:00:00 AMPPASS
###-####
BLD00-02111 BLD-Final10/24/200010/26/200010/25/2000 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 10/24/2000 at 08:32:52. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 10/25/2000 at 09:35:58.