MEC01-03138
| Final | 10/23/2001 | 10/26/2001 | 10/26/2001 12:00:00 AM | A | PASS |
|
|
###-#### TERRY
|
BLD00-00081
| BLD-Final | 10/25/2001 | 10/26/2001 | 10/26/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/25/2001 at 08:11:17. Contact: ###-####. stair enclosure only ok for t/o; need eng's/spec insp's approval affidavits for entire west wing remodel project, add appropriate signage at doors. complete tile-floor surface & maintain exiting as req'd. 10/26/2001 11:28:30 AM
|
BLD01-000-1
| BLD-Energy code compliance | 10/25/2001 | 10/26/2001 | 10/26/2001 12:00:00 AM | A | PART |
|
|
###-#### SCOTT insul ok, ok to cover. 10/26/2001 4:38:34 PM
|
BLD01-00228
| BLD-Framing/Rough-in | 10/26/2001 | 10/26/2001 | 10/26/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 10/26/2001 11:30:15 AM 3rd fl treatment areas/ walls, pending other r/i's...add perimeter wires, spacers at grid.
|
BLD01-00843
| BLD-Framing/Rough-in | 10/26/2001 | 10/26/2001 | 10/26/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 10/26/2001 11:31:31 AM 2nd fl, add wires & spacers at grid, complete firestops at corridor walls, verify hvac r/i.
|
BLD01-02756
| BLD-Foundation | 10/25/2001 | 10/26/2001 | 10/26/2001 12:00:00 AM | A | PART |
|
|
###-#### ROD bsmt wall portion...single form at rear. Center portion remains to be formed, horiz.dowels to be extended to tie wall together. large pipe to be removed. 10/26/2001 10:11:35 AM
|
BLD01-01997
| BLD-Energy code compliance | 10/25/2001 | 10/26/2001 | 10/26/2001 12:00:00 AM | P | PART |
|
|
###-#### DELBERT chk attic/crawl at final, ok to cover. 10/26/2001 3:41:18 PM
|
BLD00-03524
| BLD-Conference | 10/26/2001 | 10/26/2001 | 10/26/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 10/26/2001 2:00:20 PM rec'd arch's letter re 1hr corridors at bsmt...conc. deck ok as 1hr rating for lid.
|
BLD01-01997
| BLD-Framing/Rough-in | 10/26/2001 | 10/26/2001 | 10/26/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 10/26/2001 3:41:39 PM c/n ok
|
BLD01-01634
| BLD-Conference | 10/26/2001 | 10/26/2001 | 10/26/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 10/26/2001 4:38:02 PM w/ supt re resubmittal...ok to realign elevator and hvac chases
|
BLD01-000-1
| BLD-Framing/Rough-in | 10/26/2001 | 10/26/2001 | 10/26/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 10/26/2001 4:39:08 PM 2 hr walls ok to cover.
|
BLD00-03524
| BLD-Final | 10/26/2001 | 10/26/2001 | 10/26/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 10/26/2001 5:01:20 PM brought card in, final ok for c/o
|
BLD01-02766
| BLD-Framing/Rough-in | 10/26/2001 | 10/26/2001 | 10/26/2001 12:00:00 AM | P | PART |
|
|
scott ###-####--call 1st before insp... C/n, door hdwe, glazing, etc 10/26/2001 2:47:17 PM
|
BLD01-02768
| BLD-Framing/Rough-in | 10/26/2001 | 10/26/2001 | 10/26/2001 12:00:00 AM | P | PART |
|
|
scott ###-#### fr call 1st before insp , c/n, door hdwe 10/26/2001 2:47:37 PM
|
BLD01-02267
| BLD-Framing/Rough-in | 10/26/2001 | 10/26/2001 | 10/26/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/26/2001 at 10:07:38. Contact: ###-####....frame c/n ok pending spec insp reports for welds/fireproofing. 10/26/2001 1:58:46 PM
|
BLD00-03069
| BLD-Footing | 10/25/2001 | 10/26/2001 | 10/26/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/25/2001 at 12:53:09. Contact: ###-####. isolated canopy ftgs, kleinfelder onsite, pend report 10/26/2001 3:13:17 PM
|
BLD00-02280
| BLD-Wall cover | 10/24/2001 | 10/26/2001 | 10/26/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 10/24/2001 at 16:16:26. Contact: ###-####... spoke w/ contractor, out of time, please recall. 10/26/2001 5:27:00 PM
|