Inspections for the day of: Wednesday, October 26, 2005.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-01946 BLD-Footing10/26/200510/26/200510/26/2005 3:36:00 PMPPART
Scheduled by a contractor via Hello! on 10/26/2005 at 7:29:57 AM. Contact: ###-####.
BLD05-02198 BLD-Foundation10/26/200510/26/200510/26/2005 3:16:24 PMPPART
BLD05-01944 BLD-Foundation10/26/200510/26/200510/26/2005 3:03:50 PMPNR
hole not excavated no property lines strung.
BLD05-00836 BLD-Final10/25/200510/26/200510/26/2005 2:50:18 PMPFAIL
Scheduled by a contractor via Hello! on 10/25/2005 at 12:57:51 PM. Contact: ###-####. Landing and steps required out of masterbedroom doort to outside.
BLD05-00954 BLD-Framing/Rough-in10/26/200510/26/200510/26/2005 2:37:34 PMPFAIL
loren; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD05-02621 BLD-Footing10/26/200510/26/200510/26/2005 1:32:55 PMPPART
Scheduled by a contractor via Hello! on 10/26/2005 at 10:51:38 AM. Contact: ###-####.
BLD02-02181 BLD-Conference10/25/200510/26/200510/26/2005 9:23:38 AMAPART
rob ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Discussed possibility of taking one unit and making it into two units so that both electrical services could be used instead of using only one service. Will discuss with G. Slane for possible solutions.
BLD05-00725 BLD-Framing/Rough-in10/25/200510/26/200510/26/2005 8:48:50 AMAPART
derick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Shear wall nailing ok. Verified installation of all perimeter holdowns and strapping. Will need engineering for interioir floor to floor holdowns were no wall adove exists for connection.