BLD06-00363
| BLD-Framing/Rough-in | 10/26/2007 | 10/26/2007 | 10/26/2007 4:42:36 PM | P | PASS |
|
|
john Phone #: ###-####
|
BLD07-01288
| BLD-Final | 10/26/2007 | 10/26/2007 | 10/26/2007 4:41:35 PM | P | PASS |
|
|
gary Phone #: ###-####C/C issued
|
BLD07-01288
| DOC - Permit Finaled | 10/26/2007 | 10/26/2007 | 10/26/2007 4:40:45 PM | P | PASS |
|
|
|
BLD07-02739
| BLD-Foundation | 10/26/2007 | 10/26/2007 | 10/26/2007 3:33:04 PM | P | PASS |
|
|
steve Phone #: ###-####
|
BLD07-02401
| BLD-Framing/Rough-in | 10/26/2007 | 10/26/2007 | 10/26/2007 3:32:41 PM | P | PASS |
|
|
tony Phone #: ###-####
|
BLD07-01633
| BLD-Foundation | 10/26/2007 | 10/26/2007 | 10/26/2007 3:31:11 PM | P | PASS |
|
|
Boris ###-####
|
BLD05-02539
| BLD-Framing/Rough-in | 10/25/2007 | 10/26/2007 | 10/26/2007 12:20:55 PM | A | PART |
|
|
mike - metal steel - interior and exterior Phone #: ###-#### Talked to Mike about 3 studs required at all roof joist point loads ( 1 area ) and 1 area with studs offset at point load......will address with Engineer. After Engineer and STRATA ok..........OK to cover exterior.
|
BLD07-00455
| BLD-Final | 10/25/2007 | 10/26/2007 | 10/26/2007 11:28:49 AM | A | PASS |
|
|
tim Phone #: ###-#### C/C issued
|
BLD07-00455
| DOC - Permit Finaled | 10/26/2007 | 10/26/2007 | 10/26/2007 11:28:10 AM | P | PASS |
|
|
|
BLD07-02470
| BLD-Energy code compliance | 10/25/2007 | 10/26/2007 | 10/26/2007 11:27:25 AM | A | PASS |
|
|
tim Phone #: ###-####
|
BLD07-01145
| BLD-Energy code compliance | 10/25/2007 | 10/26/2007 | 10/26/2007 10:27:44 AM | A | PASS |
|
|
ryan Phone #: ###-####
|
BLD07-01147
| BLD-Energy code compliance | 10/25/2007 | 10/26/2007 | 10/26/2007 10:27:02 AM | A | PASS |
|
|
ryan Phone #: ###-####
|
BLD07-02739
| BLD-Footing | 10/25/2007 | 10/26/2007 | 10/26/2007 10:15:41 AM | A | PASS |
|
|
steve Phone #: ###-####
|
BLD07-00930
| BLD-Final | 10/19/2007 | 10/26/2007 | 10/25/2007 4:12:02 PM | P | NR |
|
|
brad Phone #: ###-####
|