Inspections for the day of: Friday, October 26, 2007.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAimee Hughes
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-01347 Site Final10/26/200710/26/200710/30/2007 1:24:22 PMPPASS
ESC07-01198 Random Inspection10/26/200710/26/200710/26/2007 11:50:00 AMPPASS
Site work is underway. Talked to RP about watching trackout and dust on site.
ESC07-00977 Site Final10/26/200710/26/200710/26/2007 11:21:01 AMPPASS
ESC07-01268 Conference10/26/200710/26/200710/26/2007 9:09:52 AMPPART
Met with Brad (Gulley Excavation) to walk project site. All D/I protection is in place, access control, and stock piled soils are being maintained. Some maintenance is needed on the streets and D/I protection. Crossings will be paved in the next couple of days. Contacted parks (Angela) to inform them of inspection.