BLD11-02264
| FIRE-Final Inspection | 10/26/2011 | 10/26/2011 | 10/26/2011 3:24:35 PM | P | PASS |
|
|
life safety passed
|
FIR11-00494
| INSP-Final Inspection | 10/26/2011 | 10/26/2011 | 10/26/2011 2:56:43 PM | P | FAIL |
|
|
Need the ceiling tile installed prior to a final sign off and as-builts need to be provided that match the actual installation.
|
FIR11-00436
| INSP-Sprinkler Rough-in | 10/25/2011 | 10/26/2011 | 10/25/2011 3:04:13 PM | A | PASS |
|
|
See the city approved plans for additional areas where piping is ok to cover.
|