ESC12-00845
| General Inspection | 10/26/2012 | 10/26/2012 | 10/26/2012 1:49:42 PM | | FAIL |
|
|
concrete washout not in contained pit and within 50' of canal. washout facility at max capacity. stockpile needs stabilized. LM for RP. Bob from Visser construction called back 10-29 AM to discuss and will get cleaned up.
|
ESC11-00517
| General Inspection | 10/26/2012 | 10/26/2012 | 10/26/2012 1:48:07 PM | | PASS |
|
|
|