ESC15-00142
| General Inspection | 10/26/2015 | 10/26/2015 | 10/26/2015 4:11:58 PM | | PASS |
|
|
|
ESC15-00177
| General Inspection | 10/26/2015 | 10/26/2015 | 10/26/2015 3:18:02 PM | | PASS |
|
|
|
ESC14-00356
| General Inspection | 10/26/2015 | 10/26/2015 | 10/26/2015 2:57:47 PM | | PASS |
|
|
WIP on interior. Trash and materials are contained, perimeter vegetation has been preserved. No trackout or discharges. Approved.
|
ESC15-01238
| Site Preparation | 10/26/2015 | 10/26/2015 | 10/26/2015 2:25:47 PM | P | PASS |
|
|
Clint Phone #: ###-####
BMPs ready. Site approved for excavation.
|
ESC15-01257
| Site Preparation | 10/26/2015 | 10/26/2015 | 10/26/2015 1:57:16 PM | P | PASS |
|
|
Inspection requested via web by Erby Gonzales
Permit sign posted. Mill District Square BMPs installed. Final parcels on west side of square are now starting to become active. Approved for excavation.
|
ESC15-01277
| Site Preparation | 10/24/2015 | 10/26/2015 | 10/26/2015 1:42:29 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Austin Wagner
New set of 6 new Harris Crossing SFHs approved to start on east side of the Caddis culdesac. Active projects have utilized BMPs and no disharges, trackout or other violations occuring. Install new lined washout for foundation work phase .
|
ESC15-01165
| Site Preparation | 10/24/2015 | 10/26/2015 | 10/26/2015 1:42:07 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Austin Wagner
New set of 6 new Harris Crossing SFHs approved to start on east side of the Caddis culdesac. Active projects have utilized BMPs and no disharges, trackout or other violations occuring. Install new lined washout for foundation work phase .
|
ESC15-01166
| Site Preparation | 10/24/2015 | 10/26/2015 | 10/26/2015 1:41:42 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Austin Wagner
New set of 6 new Harris Crossing SFHs approved to start on east side of the Caddis culdesac. Active projects have utilized BMPs and no disharges, trackout or other violations occuring. Install new lined washout for foundation work phase .
|
ESC15-01162
| Site Preparation | 10/24/2015 | 10/26/2015 | 10/26/2015 1:41:11 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Austin Wagner
New set of 6 new Harris Crossing SFHs approved to start on east side of the Caddis culdesac. Active projects have utilized BMPs and no disharges, trackout or other violations occuring. Install new lined washout for foundation work phase .
|
ESC15-01163
| Site Preparation | 10/24/2015 | 10/26/2015 | 10/26/2015 1:40:41 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Austin Wagner
New set of 6 new Harris Crossing SFHs approved to start on east side of the Caddis culdesac. Active projects have utilized BMPs and no disharges, trackout or other violations occuring. Install new lined washout for foundation work phase .
|
ESC15-01276
| Site Preparation | 10/24/2015 | 10/26/2015 | 10/26/2015 1:40:14 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Austin Wagner
New set of 6 new Harris Crossing SFHs approved to start on east side of the Caddis culdesac. Active projects have utilized BMPs and no disharges, trackout or other violations occuring. Install new lined washout for foundation work phase .
|
ESC14-00662
| General Inspection | 10/26/2015 | 10/26/2015 | 10/26/2015 1:18:41 PM | | PASS |
|
|
|
ESC14-00888
| General Inspection | 10/26/2015 | 10/26/2015 | 10/26/2015 12:45:54 PM | P | PASS |
|
|
BMPs at BSU Alumni Center are working well to contain sediment on site. Construction entrance is installed and access to site is controled. Curbing contains project and DIs in area have sediment bags. No corrections requested.
|
ESC15-00818
| Random Inspection | 10/26/2015 | 10/26/2015 | 10/26/2015 11:15:05 AM | P | PASS |
|
|
Minimal activity at new Fairview Tates Rents site. Perimeter wattles installed and DI bag. No trackout or other issues. Approved.
|
ESC15-00702
| Random Inspection | 10/26/2015 | 10/26/2015 | 10/26/2015 11:13:33 AM | P | PASS |
|
|
WIP on new auto sales facility. BMPs installed. No trackout or discharges off site. No corrections.
|
ESC14-00338
| General Inspection | 10/26/2015 | 10/26/2015 | 10/26/2015 10:50:16 AM | | NR |
|
|
No activity at site., BMPs not yet installed and no staging has occured. Permit just issued on 10/20. Parcel surrounded by chainlink fence
|
ESC15-00082
| General Inspection | 10/26/2015 | 10/26/2015 | 10/26/2015 10:49:57 AM | | PASS |
|
|
WIP on 4-plexes. Site perimeter has sediment containment with silt fencing and curbing/sidewalks. Parking and access drive is paved with stormwater facilities installed. No offsite runoff or trackout. Approved.
|
ESC15-00556
| Conference | 10/23/2015 | 10/26/2015 | 10/26/2015 10:13:06 AM | A | CANC |
|
|
rescheduled for 10/27.
|
ESC15-00033
| General Inspection | 10/26/2015 | 10/26/2015 | 10/26/2015 9:13:14 AM | | PASS |
|
|
WIP at new Honda on interior. No trackout outside of Auto Mall construction areas. No turbid discharges of stormwater from site.
|
ESC13-00117
| Aging Inspection | 10/26/2015 | 10/26/2015 | 10/26/2015 8:38:51 AM | | PASS |
|
|
|