Inspections for the day of: Thursday, October 26, 2017.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-03237 FIRE-Final Inspection10/26/201710/26/201710/27/2017 9:04:39 AMPFAIL
Provide address and annual inspections for the fire extinguishers.

Samuel Phone #: ###-####
BLD16-04280 FIRE-Final Inspection10/25/201710/26/201710/26/2017 3:09:35 PMPFAIL
I referred the contractor back to the plan reviewer due to questions on the review. Itmes include number of gates requiring panic hardware, door mags being used on the west side gate and possible exit signs or emergency lights in the pool area. Contractor did not have the small documents. Thumbturn dead bolts have been used on the Locker rooms where plans call for lever action. The canopy emergency lights did not work.


Please call ahead for access - Noah Phone #: ###-####
NAF17-00063 INSP-Final10/26/201710/26/201710/26/2017 2:50:15 PMPFAIL
Repair the exit sign/emergency light at the north exit and provide the correct height of address numbers.
FIR17-00114 INSP-Final Inspection10/23/201710/26/201710/26/2017 2:06:00 PMAPASS
Permit finaled. Supervisory signals were verified by Lee at all three buildings today.
FIR17-00147 INSP-Final Inspection10/24/201710/26/201710/26/2017 2:05:41 PMAPASS
Permit finaled. Supervisory signals were verified by Lee at all three buildings today.
FIR16-00284 INSP-Final Inspection10/25/201710/26/201710/26/2017 12:35:16 PMAFAIL
Not ready for final yet but we did test the dry pipe system and the interconnection with the fire alarm panel. It appears that a rough-in inspection is still needed for the garage.
FIR16-00183 INSP-Final Inspection10/25/201710/26/201710/26/2017 12:33:37 PMAPASS
Permit finaled
FIR16-00446 INSP-Final Inspection10/25/201710/26/201710/26/2017 12:32:47 PMAFAIL
Not ready for final yet but we did test two of the three fire smoke dampers and the dry pipe system interconnects. Still waiting on plan modifications, elevator and fire doors.
FIR17-00305 INSP-Sprinkler Rough-in10/25/201710/26/201710/26/2017 12:29:05 PMAPASS
Overhead rough-in passed. Corrections have been made to the seismic bracing. No cover, except hardlids until the pendants/drops have been installed and verified.
FIR17-00303 INSP-Sprinkler Rough-in10/25/201710/26/201710/26/2017 12:28:39 PMAPASS
Overhead rough-in passed. Corrections have been made to the seismic bracing. No cover, except hardlids until the pendants/drops have been installed and verified.
BLD17-00073 FIRE-Final Inspection10/25/201710/26/201710/26/2017 10:42:23 AMAPASS
Life safety passed.

Doug Phone #: ###-####
NAF17-00012 INSP-Final10/25/201710/26/201710/26/2017 9:39:59 AMADONE
life safety passed
NAF17-00073 INSP-Final10/25/201710/26/201710/26/2017 9:39:32 AMADONE
Permit finaled
FIR17-00540 INSP-Final Inspection10/25/201710/26/201710/26/2017 8:54:22 AMAPASS
Permit finaled
FIR17-00575 INSP-Sprinkler Rough-in10/25/201710/26/201710/26/2017 7:32:06 AMAPASS
Rough-in passed. Piping can be covered.