BLD00-01550
| BLD-Energy code compliance | 10/26/2000 | 10/27/2000 | 10/27/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/26/2000 at 10:02:22. Contact: ###-####.
c/n posted, ok to insulate 10/27/2000 12:06:58 PM
|
BLD00-03097
| BLD-Foundation | 10/26/2000 | 10/27/2000 | 10/27/2000 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 415 On 10/26/2000 late am
wip ,ok 10/27/2000 10:46:00 AM
|
BLD00-02355
| BLD-Final | 10/26/2000 | 10/27/2000 | 10/27/2000 12:00:00 AM | A | PASS |
|
|
Russell, ###-####
c of c # 19859 10/27/2000 12:53:16 PM
|
MEC00-03294
| Final | 10/26/2000 | 10/27/2000 | 10/27/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/26/2000 at 15:06:44. Contact: ###-####.
|
BLD00-01757
| BLD-Framing/Rough-in | 10/26/2000 | 10/27/2000 | 10/27/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/26/2000 at 22:50:13. Contact: ###-####.
nailing on shear walls needs to be done and 5/8 " type x sheet rock on alley side 10/27/2000 10:06:27 AM
|
BLD00-02151
| BLD-Final | 10/27/2000 | 10/27/2000 | 10/27/2000 12:00:00 AM | P | FAIL |
|
|
reinspection Mike ###-####
1st correction not finished, reinspection fee is charged, no inspections untill paid 10/27/2000 4:43:13 PM
|
BLD00-02726
| BLD-Footing | 10/27/2000 | 10/27/2000 | 10/27/2000 12:00:00 AM | P | PART |
|
|
Ed ###-####
wip, ok 10/27/2000 3:26:00 PM
|
BLD00-03213
| BLD-Footing | 10/27/2000 | 10/27/2000 | 10/27/2000 12:00:00 AM | P | PART |
|
|
###-#### David
already poured 10/27/2000 4:26:17 PM
|
BLD00-01757
| BLD-Framing/Rough-in | 10/27/2000 | 10/27/2000 | 10/27/2000 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 415 On 10/27/2000 look at fire wall nailing on property line and shear on inside
all ok, no electrical @ this time 10/27/2000 4:05:59 PM
|
BLD00-01213
| BLD-Final | 10/25/2000 | 10/27/2000 | 10/27/2000 12:00:00 AM | P | FAIL |
|
|
###-#### Buster
c/n posted, handrail, guardrail 10/27/2000 3:12:01 PM
|