PLM05-02549
| Plumbing Rough-in | 10/27/2005 | 10/27/2005 | 10/27/2005 4:03:28 PM | P | PASS |
|
|
|
PLM05-03791
| Plumbing Rough-in | 10/27/2005 | 10/27/2005 | 10/27/2005 3:05:01 PM | P | FAIL |
|
|
simpson plumb test failed on D.W.V. system note water test ok called contractor
|
PLM05-02237
| Final | 10/25/2005 | 10/27/2005 | 10/27/2005 2:37:56 PM | P | PASS |
|
|
Tim is the contact; Phone #: ###-#### Internet Inspection Request from: James Stanford
|
PLM05-02223
| Final | 10/26/2005 | 10/27/2005 | 10/27/2005 2:07:11 PM | P | PASS |
|
|
james
|
PLM05-03772
| Plumbing Rough-in | 10/26/2005 | 10/27/2005 | 10/27/2005 12:51:45 PM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/26/2005 at 4:59:56 PM. Contact: ###-####.
|
PLM05-03780
| Sprinkler (Final) | 10/26/2005 | 10/27/2005 | 10/27/2005 9:51:48 AM | A | FAIL |
|
|
###-#### - justin ne3ed to move blow out tee yo down stream side of R.P. and provide nonpotable water sign,s to hose bibb connection,s down stream of R.P. CONTRACTOR to recall when ready
|
PLM05-03768
| DOC - Permit Finaled | 10/27/2005 | 10/27/2005 | 10/27/2005 12:00:00 AM | P | PASS |
|
|
john - ###-####
|