ELE08-02073
| Conference | 10/27/2008 | 10/27/2008 | 10/27/2008 4:07:34 PM | P | DONE |
|
|
terrance Note: Late this afternoon 4 if possible Phone #: ###-#### met owner, talked about u/g, type of conductor, j-box, power for pump and location, depth under slab, providing pedestal for j-box and receptacle, no esc this project
|
ELE08-02873
| Electrical Rough-In | 10/27/2008 | 10/27/2008 | 10/27/2008 2:28:37 PM | P | PASS |
|
|
eric Note: walls and ceiling Phone #: ###-#### walls and ceiling ok to cover
|
ELE07-03307
| Rough-In Permanent Service | 10/27/2008 | 10/27/2008 | 10/27/2008 1:32:16 PM | P | CANC |
|
|
Contact Neil Ramsey. Rough-in for floors 15-18 stairwells East and West. Phone #: ###-#### Internet Inspection Request from: Shelli Daylong wrong type request, see ri
|
ELE07-03307
| Electrical Rough-In | 10/27/2008 | 10/27/2008 | 10/27/2008 1:32:03 PM | P | PASS |
|
|
Contact Neil Ramsey. Rough-in for floors 15-18 stairwells East and West. Phone #: ###-#### Internet Inspection Request from: Shelli Daylong ri ok 15th thru 18th stairwells east and west side
|
ELE08-02243
| Final | 10/27/2008 | 10/27/2008 | 10/27/2008 12:34:56 PM | P | PASS |
|
|
clyde Phone #: ###-#### called contractor, ok to final, signed occupancy card
|
ELE07-02192
| Final | 10/27/2008 | 10/27/2008 | 10/27/2008 10:56:57 AM | A | PASS |
|
|
ok to final temp power
|
ELE08-02013
| Final | 10/27/2008 | 10/27/2008 | 10/27/2008 10:18:29 AM | A | PASS |
|
|
looked at sign, ok to final, no esc this project
|
ELE08-02898
| Electrical Rough-In | 10/24/2008 | 10/27/2008 | 10/27/2008 10:07:36 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton ri bathroom only ok to cover, no esc this project
|
ELE08-02896
| Permanent Service | 10/24/2008 | 10/27/2008 | 10/27/2008 9:33:51 AM | A | PASS |
|
|
phil Phone #: ###-#### p/s exst meter pak n ok, no esc this project
|
ELE08-01103
| Final | 10/24/2008 | 10/27/2008 | 10/27/2008 8:46:33 AM | A | PART |
|
|
forrest Phone #: ###-#### 2nd floor ok, 1st floor will have some fixtures installed, flex supported, ko sealed, grounds for exit lites, need to leave correction notice open until owner supports low voltage wiring, no esc this project
|