ESC08-00539
| Tracking Control | 10/27/2008 | 10/27/2008 | 10/27/2008 4:30:48 PM | P | FAIL |
|
|
Need to clean up loose sediment off of both access to the site. Also post a washout station sign.
|
ESC07-00987
| Conference | 10/27/2008 | 10/27/2008 | 10/27/2008 3:27:00 PM | P | DONE |
|
|
Spoke with RP and gave him permission to allow temporary access on the project area With out an approved construction entrance for the removal of stock piles only.
|
ESC07-00585
| Site Final | 10/27/2008 | 10/27/2008 | 10/27/2008 2:31:26 PM | P | PASS |
|
|
|
ESC06-01716
| Site Final | 10/27/2008 | 10/27/2008 | 10/27/2008 2:30:51 PM | P | PASS |
|
|
|
ESC07-00339
| Site Final | 10/27/2008 | 10/27/2008 | 10/27/2008 2:29:26 PM | P | PASS |
|
|
All work on pool is complete.
|
ESC08-00193
| Site Final | 10/27/2008 | 10/27/2008 | 10/27/2008 11:48:50 AM | A | PASS |
|
|
|
ESC08-00870
| Site Preparation | 10/20/2008 | 10/27/2008 | 10/27/2008 11:32:01 AM | A | PASS |
|
|
|
ESC07-01139
| Tracking Control | 10/21/2008 | 10/27/2008 | 10/27/2008 11:31:49 AM | A | PASS |
|
|
Still working on landscaping but parking lot swept up.
|
ESC08-00458
| General Inspection | 10/24/2008 | 10/27/2008 | 10/27/2008 9:08:45 AM | A | PART |
|
|
Minor sediment in the street area. Told the landscapers to sweep up by the end of the day.
|
ESC08-00225
| Tracking Control | 10/22/2008 | 10/27/2008 | 10/27/2008 8:51:24 AM | A | PART |
|
|
One area looks good, but the back side needs some attention.
|
ESC07-01595
| BMP Violation | 10/23/2008 | 10/27/2008 | 10/27/2008 8:18:06 AM | A | PASS |
|
|
All storm drains are now protected.
|
ESC08-00400
| Site Final | 10/20/2008 | 10/27/2008 | 10/27/2008 8:10:12 AM | A | NR |
|
|
Still completing the project.
|