ELE09-01601
| ELE-Aging Inspection | 10/27/2009 | 10/27/2009 | 11/3/2009 3:39:58 PM | | DONE |
|
|
no activity, suc, no esc this project
|
ESC09-00584
| General Inspection | 10/27/2009 | 10/27/2009 | 10/27/2009 3:30:09 PM | P | PASS |
|
|
looked ok
|
ESC08-00457
| General Inspection | 10/27/2009 | 10/27/2009 | 10/27/2009 3:29:29 PM | P | PASS |
|
|
looked ok
|
ESC09-00589
| General Inspection | 10/27/2009 | 10/27/2009 | 10/27/2009 3:28:52 PM | P | CANC |
|
|
wrong area, not looked at by 370
|
ESC09-00567
| General Inspection | 10/27/2009 | 10/27/2009 | 10/27/2009 3:27:42 PM | P | PASS |
|
|
looked ok
|
ESC09-00393
| General Inspection | 10/27/2009 | 10/27/2009 | 10/27/2009 3:26:58 PM | P | PASS |
|
|
looked ok, not reseeded
|
ESC07-01081
| General Inspection | 10/27/2009 | 10/27/2009 | 10/27/2009 3:26:05 PM | P | PASS |
|
|
looked ok
|
ESC09-00181
| Complaint Inspection | 10/27/2009 | 10/27/2009 | 10/27/2009 3:25:17 PM | P | CANC |
|
|
wrong type request 370 assigned to self
|
ELE09-01419
| Final | 10/27/2009 | 10/27/2009 | 10/27/2009 3:17:09 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: John VanZandt ok to final
|
ELE09-02031
| Electrical Rough-In | 10/27/2009 | 10/27/2009 | 10/27/2009 2:30:52 PM | P | PART |
|
|
EOC in sailfish Phone #: ###-#### Internet Inspection Request from: Thomas Marshall walls ok, will call ceiling in later, no esc this project
|
ELE09-02079
| Temporary Service | 10/26/2009 | 10/27/2009 | 10/27/2009 1:33:16 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Stephen Kren t/s u/g n ok, no esc this project
|
ELE09-02080
| Temporary Service | 10/26/2009 | 10/27/2009 | 10/27/2009 12:55:27 PM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Stephen Kren called, left correction notice, NEC 250.53(G) upper end of electrode shall be flush with or below ground, 230.70 shall provide means to disconnect all conductors, 406.8(B) 15 and 20a receptacles shall be listed weather resistant type, no esc this project
|
ELE09-02050
| Final | 10/27/2009 | 10/27/2009 | 10/27/2009 10:53:59 AM | P | PASS |
|
|
Rex please call first before going out Phone #: ###-#### ok to final, no esc this project
|
ELE09-02050
| Permanent Service | 10/27/2009 | 10/27/2009 | 10/27/2009 10:18:34 AM | A | PASS |
|
|
Rex please call first before going out Phone #: ###-#### p/s u/g n ok, no esc this project
|
ELE09-02083
| Electrical Rough-In | 10/26/2009 | 10/27/2009 | 10/27/2009 10:12:23 AM | A | PASS |
|
|
John Phone #: ###-#### called contractor, ric ok
|
ELE09-02048
| Conference | 10/22/2009 | 10/27/2009 | 10/27/2009 9:44:16 AM | A | DONE |
|
|
robert Phone #: ###-#### talked about relocate rear outside receptacle, then do work, call for ri, and we can final at sane time, no esc this project
|
ELE09-01936
| Temporary Service | 10/26/2009 | 10/27/2009 | 10/27/2009 9:04:44 AM | A | FAIL |
|
|
dennis Phone #: ###-#### called, left message, could not talk to person, permit is for house, not t/s, needs to pull new t/s permit, pole there needs lots of work before inspection
|
ELE09-00881
| Electrical Rough-In | 10/27/2009 | 10/27/2009 | 10/27/2009 8:28:00 AM | A | CANC |
|
|
Requesting partial final. Would like inspection to be on Stud Mill section only. Phone #: ###-#### Internet Inspection Request from: nathan palmer Inspection cancelled from web by: nathan palmer
|
ELE09-01826
| Electrical Rough-In | 10/26/2009 | 10/27/2009 | 10/27/2009 8:24:51 AM | A | PART |
|
|
underground inspection Phone #: ###-#### Internet Inspection Request from: Randy Vail u/g ok to cover anop
|