BLD09-00818
| BLD-Conference | 10/27/2009 | 10/27/2009 | 10/27/2009 6:08:31 PM | P | DONE |
|
|
Regarding an existing fire smoke damper.
|
BLD09-00055
| FIRE-Final Inspection | 10/27/2009 | 10/27/2009 | 10/27/2009 6:07:39 PM | P | NR |
|
|
|
FIR08-00699
| INSP-Final Inspection | 10/27/2009 | 10/27/2009 | 10/27/2009 6:07:14 PM | P | PASS |
|
|
Fire sprinkler permit work final approved.
|
FIR08-00754
| INSP-Final Inspection | 10/26/2009 | 10/27/2009 | 10/27/2009 6:06:04 PM | P | NR |
|
|
Need permit documents, review notes and stamped/approved drawings on site for this work permit # FIR08-00754.
|
FIR09-00476
| INSP-Sprinkler Rough-in | 10/27/2009 | 10/27/2009 | 10/27/2009 6:02:11 PM | P | PART |
|
|
Overhead rough-in inspection for the 2nd floor antifreeze system okayed for cover, discussed items remaining for permit final.
|
BLD08-01105
| FIRE-Final Inspection | 10/26/2009 | 10/27/2009 | 10/27/2009 6:00:34 PM | A | PASS |
|
|
C/N items verified for completion, fire life safety approved for final status.
|
FIR09-00476
| INSP-Sprinkler Rough-in/Hydro | 10/26/2009 | 10/27/2009 | 10/27/2009 5:59:08 PM | A | PART |
|
|
2nd floor antifreeze system hydrostatic testing completed acceptable, inspection passed.
|