GCB09-00043
| GCB-Final | 10/26/2009 | 10/27/2009 | 10/27/2009 3:53:44 PM | A | FAIL |
|
|
Contact Zan@###-####. Needs to provide lock indicator at main door. Also inspected grid ok.
|
GCB09-00060
| GCB-Footing | 10/26/2009 | 10/27/2009 | 10/27/2009 2:22:49 PM | A | PASS |
|
|
Please call Dustin@###-#### Prior to come in for inspection. Footing for halfwall ok. Also inspected framing. ok.
|
ESC09-00182
| Random Inspection | 10/27/2009 | 10/27/2009 | 10/27/2009 1:59:01 PM | P | PASS |
|
|
|
BLD09-00516
| BLD-Foundation | 10/27/2009 | 10/27/2009 | 10/27/2009 1:58:47 PM | P | PASS |
|
|
chris Phone #: ###-####. Column pad footings for bldg. #2. ok.
|
BLD09-00385
| BLD-Final | 10/26/2009 | 10/27/2009 | 10/27/2009 11:23:48 AM | A | NR |
|
|
Braxton Phone #: ###-####. Needs zoning sign off.
|
BLD09-00386
| BLD-Final | 10/26/2009 | 10/27/2009 | 10/27/2009 11:23:27 AM | A | NR |
|
|
Braxton Phone #: ###-####. Needs zoning sign off.
|
BLD09-00965
| BLD-Other | 10/26/2009 | 10/27/2009 | 10/27/2009 10:06:03 AM | A | NR |
|
|
ceiling grid insp//Jared Phone #: ###-####. Needs elec. ri insp. first.
|
BLD09-00244
| BLD-Framing/Rough-in | 10/26/2009 | 10/27/2009 | 10/27/2009 10:05:37 AM | A | PART |
|
|
corey - partial Phone #: ###-####. Drag truss connections in areas 1 and 2 ok as per RFI from engineer. Will have RFI scanned into permit.
|
ESC09-00086
| Random Inspection | 10/27/2009 | 10/27/2009 | 10/27/2009 10:03:04 AM | A | PASS |
|
|
Trash bins have been emptied. Site is clean. BMP's in place.
|
ESC09-00086
| Random Inspection | 10/27/2009 | 10/27/2009 | 10/27/2009 10:02:22 AM | A | CANC |
|
|
|