Inspections for the day of: Wednesday, October 27, 2010.
Number of inspections: 1
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00352 General Inspection10/25/201010/27/201010/27/2010 11:38:40 AMAPASS
Turbidimeter -- Water sampling: Site conditions, clear, sunny and 47 degrees, time 10:35 (start of sample). Water at Ped. Bridge, MW#1 4.12 NTU, at north berm, MW#3, 3.99 NTU, at river inside containment, MW#4 4.00 NTU and background of Boise River, appr. 25 feet upgrade of Wellings Discharge, 4.80 NTU. Verfied calibration and thriple Rinse of sampling jar with D. I. water between samples. Samples indicated within range for compliance through construction site.