Inspections for the day of: Wednesday, October 27, 2010.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00082 FIR-Aging Inspection10/27/201010/27/201010/28/2010 10:58:14 AM NR
Work is in progress. Per Guy all of these AES inspections are being called in shortly.
FIR09-00081 FIR-Aging Inspection10/27/201010/27/201010/28/2010 10:57:43 AM NR
Work is in progress. Per Guy all of these AES inspections are being called in shortly.
FIR09-00077 FIR-Aging Inspection10/27/201010/27/201010/28/2010 10:56:38 AM NR
Work is in progress. Per Guy all of these AES inspections are being called in shortly.
FIR10-00297 INSP-Conference10/27/201010/27/201010/28/2010 10:23:19 AMPDONE
I spoke to Lori about theis projects status.
FIR10-00236 INSP-Sprinkler Rough-in10/26/201010/27/201010/27/2010 2:37:57 PMAPASS
The sprinkler piping above the private dining area is ok to cover. Coverage has not been provided yet in the accordian wall pocket.
BLD10-02227 FIRE-Final Inspection10/27/201010/27/201010/27/2010 1:16:07 PMPPASS
life safety passed
BLD09-01239 FIRE-Final Inspection10/26/201010/27/201010/27/2010 11:41:43 AMAPASS
life safety passed
FIR10-00101 INSP-Final Inspection10/27/201010/27/201010/27/2010 11:40:16 AMPPASS
Permit finaled. EOL verified.
BLD10-02029 FIRE-Final Inspection10/26/201010/27/201010/27/2010 11:38:48 AMAPASS
Life safety passed.
BLD09-01239 FIRE-Alarm Testing10/26/201010/27/201010/27/2010 10:25:05 AMAPASS
fire alarm testing passed.
FIR10-00482 INSP-Final Inspection10/26/201010/27/201010/27/2010 8:47:54 AMAPASS
Permit finaled