Inspections for the day of: Thursday, October 27, 2011.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00297 INSP-Final Inspection10/27/201110/27/201110/27/2011 3:07:33 PMPFAIL
The underground conduit connecting the three buildings appears to be PVC and not the metallic conduit as stated on the plans. After confiring with Doug Poedy it was clear in both NFPA 72 and NEC that the only options for the interbuilding fire alarm circuiting are: provide a metalic cable shield (grounded to the building electrode system), run in metalic conduit (grounded to the building electrode system), or provide isolation modules. As-builts will be needed reflecting what is used. Will also need the netcom verified. Mount the building maps. Devices are labeled building "b" and "c" but not building "a". Relabel devices for building "a" so that consistancy is maintained. All other items have been checked.
BLD11-02527 FIRE-Final Inspection10/27/201110/27/201110/27/2011 11:58:48 AMPPASS
life safety passed
BLD11-00406 FIRE-Final Inspection10/27/201110/27/201110/27/2011 11:57:38 AMPPASS
life safety passed
FIR11-00405 INSP-Final Inspection10/26/201110/27/201110/27/2011 11:03:15 AMAFAIL
The pizza oven suppression system can be finaled when the paper work is signed. Per the IMC commentary this type of oven can be installed under a type II hood so the duct/plenum nozzles are adequate. The other supression system, when activated, did not turn off the under hood lights. So it will need to be retested once the wiring has been corrected.
FIR11-00404 INSP-Final Inspection10/26/201110/27/201110/27/2011 11:03:01 AMAFAIL
The pizza oven suppression system can be finaled when the paper work is signed. Per the IMC commentary this type of oven can be installed under a type II hood so the duct/plenum nozzles are adequate. The other supression system, when activated, did not turn off the under hood lights. So it will need to be retested once the wiring has been corrected.
FIR11-00474 INSP-Final Inspection10/27/201110/27/201110/27/2011 10:47:39 AMAPASS
permit finaled
FIR11-00023 INSP-Final Inspection10/27/201110/27/201110/27/2011 10:47:13 AMAPASS
permit finaled
FIR11-00428 INSP-Alarm Testing10/26/201110/27/201110/27/2011 10:46:23 AMAPASS
permit finaled
BLD11-02527 FIRE-Final Inspection10/26/201110/27/201110/27/2011 10:46:04 AMAFAIL
Repair or remove the exit signs, provide single action hardware and remove the thumbturn lock on the rear exit door.
FIR11-00305 INSP-Final Inspection10/26/201110/27/201110/27/2011 8:45:16 AMAPASS
permit finaled