Inspections for the day of: Thursday, October 27, 2011.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00627 General Inspection10/27/201110/27/201110/31/2011 7:40:52 AM PASS
ESC11-00765 Site Preparation10/27/201110/27/201110/28/2011 7:59:39 AM PASS
ESC10-00921 General Inspection10/27/201110/27/201110/27/2011 2:05:01 PM DONE
Permit finaled.
ESC10-00921 Site Final10/27/201110/27/201110/27/2011 2:04:47 PMPPASS
ESC11-00386 Site Final10/27/201110/27/201110/27/2011 9:28:26 AMPNR
Siter has not achieved a uniformed growth over the disturbed soil areas of the project.
ESC11-00652 Site Preparation10/27/201110/27/201110/27/2011 9:18:31 AM PASS
ESC11-00410 Site Preparation10/27/201110/27/201110/27/2011 9:17:26 AM NR
Have staged equipment but have not begun.
ESC11-00665 General Inspection10/27/201110/27/201110/27/2011 8:09:54 AM PASS