Inspections for the day of: Monday, October 27, 2014.
Number of inspections: 28
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00071 DOC - Permit Finaled10/27/201410/27/201410/27/2014 3:49:46 PMPPASS
Terraces hospital unit within compound and perimeter controls. All ESC related inspections at Terraces are documented on the main site permit ESC13-00755. No further inspections on this permit.
ESC13-00070 DOC - Permit Finaled10/27/201410/27/201410/27/2014 3:49:28 PMPPASS
Terraces hospital unit within compound and perimeter controls. All ESC related inspections at Terraces are documented on the main site permit ESC13-00755. No further inspections on this permit.
ESC13-00095 DOC - Permit Finaled10/27/201410/27/201410/27/2014 3:46:14 PMPPASS
ESC13-00095 Site Final10/27/201410/27/201410/27/2014 3:45:41 PMPPASS
No further construction activity. Disturbed area stabilized, no materials or loose sediment at site. BLD still open... ESC conditions satisfied.
ESC13-00072 DOC - Permit Finaled10/27/201410/27/201410/27/2014 3:18:20 PMPPASS
Terraces hospital building within compound and perimeter controls. All ESC related inspections at Terraces are documented on the main site permit ESC13-00755. No further inspections on this permit.
ESC13-00073 DOC - Permit Finaled10/27/201410/27/201410/27/2014 3:16:57 PMPPASS
Terraces condo unit within compound and perimeter controls. All ESC related inspections at Terraces are documented on the main site permit ESC13-00755. No further inspections on this permit.
ESC13-00074 DOC - Permit Finaled10/27/201410/27/201410/27/2014 3:16:22 PMPPASS
Terraces condo unit within compound and perimeter controls. All ESC related inspections at Terraces are documented on the main site permit ESC13-00755. No further inspections on this permit.
ESC13-00075 DOC - Permit Finaled10/27/201410/27/201410/27/2014 3:14:46 PMPPASS
Terraces condo unit within compound and perimeter controls. All ESC related inspections at Terraces are documented on the main site permit ESC13-00755. No further inspections on this permit.
ESC13-00077 DOC - Permit Finaled10/27/201410/27/201410/27/2014 3:14:01 PMPPASS
Terraces condo unit within compound and perimeter controls. All ESC related inspections at Terraces are documented on the main site permit ESC13-00755. No further inspections on this permit.
ESC13-00078 DOC - Permit Finaled10/27/201410/27/201410/27/2014 3:13:21 PMPPASS
Terraces condo unit within compound and perimeter controls. All ESC related inspections at Terraces are documented on the main site permit ESC13-00755. No further inspections on this permit.
ESC13-00067 DOC - Permit Finaled10/27/201410/27/201410/27/2014 3:11:48 PMPPASS
Terraces condo unit within compound and perimeter controls. All ESC related inspections at Terraces are documented on the main site permit ESC13-00755. No further inspections on this permit.
ESC14-00392 General Inspection10/27/201410/27/201410/27/2014 2:47:50 PM PASS
Airport parking lot resurfacing and perimeter landscaping project is still underway. No trackout onto Airport Way; no loose stockpiles; parking areas that have been paved have been swept to remove loose sediment. No corrections required.
ESC13-00449 Random Inspection10/27/201410/27/201410/27/2014 1:41:37 PMPPASS
Dennis Dillon display berm is about have complete. Vehicle parking area has been paved. Site is not yet landscaped and some utility work for lighting and stormwater drainage is in progress. No trackout to Phillipi, construction entrance is installed. Previous trackout issues have been resolved and streets adequately cleaned.
ESC13-00444 Aging Inspection10/27/201410/27/201410/27/2014 1:39:22 PM PASS
Construction is ongoing. Homesite and adjacent open parcel have perimeter wattles along Hilton. No trackout or sediment collecting in street/gutter. There is some road & utility work on Hilton in front of house. No corrections required.
ESC14-00349 General Inspection10/27/201410/27/201410/27/2014 1:10:57 PM PART
Work and area of disturbance is at the southern end of the Simplot Plant Research complex. Permit is posted at gate off of Phillipi.

Site does not have a rock construction entrance so there is some minor trackout to Phillipi. Stabilization and paving of the public bike path should occur soon; in the meanwhile Phillipi should be swept periodically.

No other violations observed.
ESC14-00963 Site Preparation10/24/201410/27/201410/27/2014 11:51:15 AMAPASS
Permit posted with RP contact details. Work has not yet started. Occupied home adjacent to site. No offstreet contractor parking allowed. Washout pit for Sunnyridge projects is provided. Stormdrain on culdesac has inlet sediment bag; main BMP will be housekeeping.
ESC13-01210 General Inspection10/27/201410/27/201410/27/2014 11:13:18 AM PASS
Construction is complete and disturbed area stabiized. Work area has been cleaned. ESC permit conditions satisfied.
ESC13-01210 DOC - Permit Finaled10/27/201410/27/201410/27/2014 11:11:48 AMPPASS
ESC13-00924 General Inspection10/27/201410/27/201410/27/2014 11:01:29 AM PASS
Phase 5 of Pine Tree Village still has some remaining units to build. Central material staging area is still in use. Storm drain inlets have protection, no trackout of sediment or mud to streets. Wallboard crews on townhouses need to improve containment of waste scraps in phase 6 on Shoup - some debris on sidewalk. Workers stated it would be swept up today.

No corrections for phase 5.
ESC14-00086 Random Inspection10/27/201410/27/201410/27/2014 10:39:19 AMAPASS
Village Chaton Sub is in progress. Parking lot has been paved and the frames are up for the fourplexes. Permit is posted on job trailer. No trackout to Ustick or sediment leaving jobsite. Approved.
ESC14-00210 General Inspection10/27/201410/27/201410/27/2014 10:01:44 AM PASS
Office shell construction activity is complete and parcel is landscaped. Adajacent parcels are prepped for future construction. Parking lot is clean, BMPs are removed; ESC permit conditions satisfied.
ESC14-00210 DOC - Permit Finaled10/27/201410/27/201410/27/2014 10:00:24 AMPPASS
ESC13-00561 General Inspection10/27/201410/27/201410/27/2014 9:45:34 AM PASS
Interior work ongoing at TV Hospital. No exterior earth disturbance; staging area and storage containers are located along back alley. No spills or other stormwater pollution sources observed. Approved.
ESC13-00655 Random Inspection10/27/201410/27/201410/27/2014 9:30:11 AMPPASS
Aberdeen sub development still in progress. 4 plexes with seperate ESC permits are in compliance. Streets and gutters appear to be recently swept, trash and construction materials are contained;

Correction request to provide new concrete washout for the new phase has been completed and is lined.

No trackout or other BMP violations at time of construction. Workers staying off unpaved dirt areas.
ESC14-00386 General Inspection10/27/201410/27/201410/27/2014 9:25:07 AM PASS
Aberdeen 4-plex unit is complete and landscaped. All permits finaled. Aberdeen sub development is ongoing, site currently in compliance.
ESC14-00386 DOC - Permit Finaled10/27/201410/27/201410/27/2014 9:24:07 AMPPASS
ESC14-00349 DOC - Permit Finaled10/27/201410/27/201410/27/2014 9:23:38 AMPPASS
(This activity was added in error so we have changed the case status back to Issued.)
ESC14-00396 General Inspection10/27/201410/27/201410/27/2014 8:41:10 AM PASS
Construction on new tennis courts at Ann Morrison is complete. Parking lot and curb work is installed and no loose sediment. Landscaping/stabilization with sod and bark. ESC conditions satisfied.