FIR17-00544
| INSP-Final Inspection | 10/26/2017 | 10/27/2017 | 10/27/2017 5:03:39 PM | P | FAIL |
|
|
Pendant heads are blocked by surface mount light fixtures.
|
FIR17-00566
| INSP-Final Inspection | 10/26/2017 | 10/27/2017 | 10/27/2017 5:03:04 PM | P | PASS |
|
|
Permit finaled
|
BLD16-01058
| FIRE-Conference | 10/26/2017 | 10/27/2017 | 10/27/2017 5:02:43 PM | P | DONE |
|
|
Tenting of sprinkler lines in units 509-519 passed. Numerous corrections made while I was on site. I also made an entry in the project related fire sprinkler permit activites.
|
FIR16-00586
| INSP-Sprinkler Rough-in | 10/27/2017 | 10/27/2017 | 10/27/2017 5:01:52 PM | P | PASS |
|
|
Tenting of sprinkler lines in units 509-519 passed. Numerous corrections made while I was on site.
|
BLD16-02415
| FIRE-Final Inspection | 10/27/2017 | 10/27/2017 | 10/27/2017 5:00:47 PM | P | CANC |
|
|
Need to cancel due to time constraints. Hunter is going to reschedule for monday.
Contact: Hunter Gomez Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD15-03489
| FIRE-Final Inspection | 10/27/2017 | 10/27/2017 | 10/27/2017 5:00:07 PM | P | CANC |
|
|
Need to cancel due to time constraints. Scott is going to reschedule for monday.
Scott Phone #: ###-#### Requesting TCO for balance of project (10th floor and 02 rooms).
|
BLD06-02324
| FIRE-Final Inspection | 10/26/2017 | 10/27/2017 | 10/27/2017 3:12:33 PM | A | FAIL |
|
|
Not ready for a final yet. Today we verified exit signs and emergency lights (two on first and one on third did not work), fire extinguishers appear ok, address appears ok, door hardware except for the access control (not tested yet) appears ok, need fire doors installed and tested at the elevator as well as fire alarm and fire sprinkler finals.
|
BLD17-00162
| FIRE-Final Inspection | 10/26/2017 | 10/27/2017 | 10/27/2017 3:03:46 PM | A | FAIL |
|
|
No inspection performed due to no small documents on site. I noted the need for a fire extinguisher and specific requirements for the storage of hazardous chemicals.
|
FIR16-00446
| INSP-Final Inspection | 10/25/2017 | 10/27/2017 | 10/27/2017 3:01:07 PM | A | CANC |
|
|
Bob Thorton will be the site contact. Phone #: ###-#### Inspection requested via web by Stacie Tasker
|
FIR17-00617
| INSP-Sprinkler Rough-in | 10/26/2017 | 10/27/2017 | 10/27/2017 2:26:36 PM | A | PASS |
|
|
Cover inspection at South Bore is passed and can be covered. This is from the Suez point of connection to Big Mike the locomotive.
|
FIR17-00473
| INSP-Sprinkler Rough-in | 10/26/2017 | 10/27/2017 | 10/27/2017 2:24:43 PM | A | PASS |
|
|
See the city approved plans for locations marked with todays date where sprinkler piping is ok for cover.
|
FIR17-00552
| INSP-Final Inspection | 10/27/2017 | 10/27/2017 | 10/27/2017 1:43:14 PM | P | PASS |
|
|
Jim Danes Phone #: ###-#### Inspection requested via web by Connie Danes
|
BLD17-01694
| FIRE-Final Inspection | 10/25/2017 | 10/27/2017 | 10/27/2017 1:42:29 PM | P | FAIL |
|
|
No city approved plans or small documents on site. No address is present. Knox box has been removed. Racking permit is not signed off yet, Contractor stated delayed egress locks are being utilized so I went over IFC requirements for delayed egress locks which includes connection with the existing fire alarm system. I also noted that the mechanical plans indicate seven duct smoke detectors to be installed. We called the mechanical installer and he stated that by using the exception in the IMC only one is required. He is going to get approval from the mechanical engineer to delete the non-required and provide to me. But the one required duct smoke detector again will need to be tied into the existing fire alarm system. I noted thumbturn dead bolts at the main exit. This was only a partial courtesy inspection since no approved documents are on site.
Smith Phone #: ###-####
|
FIR17-00537
| INSP-Sprinkler Rough-in | 10/26/2017 | 10/27/2017 | 10/27/2017 11:07:13 AM | A | PASS |
|
|
Rough-in passed. Piping can be covered.
Michael Phone #: ###-####
|
BLD17-02385
| FIRE-Final Inspection | 10/26/2017 | 10/27/2017 | 10/27/2017 9:25:05 AM | A | PASS |
|
|
Life safety passed.
Ed Phone #: ###-####
|
FIR17-00569
| INSP-Final Inspection | 10/26/2017 | 10/27/2017 | 10/27/2017 8:54:19 AM | A | FAIL |
|
|
Not ready for final due to the PIV not reporting correctly and I noted alot of the notofication devices are overspaced and the area behind the front counter has no coverage. No actual testing performed. I went over items with the tech. Plans are too small to read and do not show the communication means being used. As-builts or possibly plan modifications are needed.
Jeremy Berg Phone #: ###-####
|
FIR17-00205
| INSP-Final Inspection | 10/26/2017 | 10/27/2017 | 10/27/2017 8:41:44 AM | A | CANC |
|
|
Not ready for final due to the project related fire alarm not being ready.
|
NAF17-00063
| INSP-Final | 10/26/2017 | 10/27/2017 | 10/27/2017 8:40:57 AM | A | DONE |
|
|
Life safety passed
|