Inspections for the day of: Tuesday, October 28, 1997.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD96-03200 INSP - Conference10/28/199710/28/199710/28/1997 12:00:00 AMAPASS
CALLED ODIE W/ STEED: UNABLE TO ACCESS, HE'LL NEED TO RECALL & HAVE NEW CARD SIGNED OFF FOR C/O OR LC (SHELL BLDG FOR TCBY)
BLD97-00044 INSP - Conference10/28/199710/28/199710/28/1997 12:00:00 AMAPASS
W/ DAN S. RE 2HR WALL AT BGSMT...TEMP JOG AT TANK YET TO BE REMOVED. SHOULD BE DONE SOON AS CHILLER ADDED WILL BE ONLINE.
BLD97-00401 INSP - Conference10/28/199710/28/199710/28/1997 12:00:00 AMAPASS
W/ DAN S. RE RESUBMITTAL HP 6
BLD97-02397 INSP - Conference10/28/199710/28/199710/28/1997 12:00:00 AMAPASS
W/ BLDR RE FINAL REQS
BLD97-02747 INSP - Framing/Rough-in10/28/199710/28/199710/28/1997 12:00:00 AMPFAIL
C/N, TRUSS BRG (CLIPS REQ'D)
BLD97-02747 INSP - Energy code compliance10/28/199710/28/199710/28/1997 12:00:00 AMPPART
C/N ON FRAME
MEC97-03072 INSP - Gas pressure test10/28/199710/28/199710/28/1997 12:00:00 AMPNR
NO ONE HOME, NO GAGE VISIBLE.
BLD97-00494 INSP - Conference10/28/199710/28/199710/28/1997 12:00:00 AMPPASS
W/ SLY; HE REC'D FINAL SPEC. INSP REPORT...WILL FORWARD TO ME.
BLD97-01498 INSP - Foundation10/27/199710/28/199710/28/1997 12:00:00 AMPPART
BASEMENT SLABS...gave owner verbal c/n to make sure all wood forms are removed from slab. ok to proceed.
BLD97-01825 INSP - Carpentry10/28/199710/28/199710/28/1997 12:00:00 AMPPASS
3:00 W/ BLDR. beam support ok
BLD97-01825 INSP - Framing/Rough-in10/29/199710/28/199710/28/1997 12:00:00 AMPPASS
c/n ok