PLM02-03273
| Sprinkler (Final) | 10/25/2002 | 10/28/2002 | 10/28/2002 12:00:00 AM | A | NR |
|
|
###-####
|
PLM02-03275
| Plumbing Rough-in | 10/25/2002 | 10/28/2002 | 10/28/2002 12:00:00 AM | A | PASS |
|
|
###-#### ri ok 10/28/2002 9:35:40 AM
|
PLM02-03124
| Other | 10/28/2002 | 10/28/2002 | 10/28/2002 12:00:00 AM | A | PART |
|
|
ri conference with greg and rounded up the site guy and instructed him on the perimtting and inspection requirements in the city, will review engineers photos of work already installed for determining code compliance if possable
|
PLM02-03260
| Plumbing Rough-in | 10/28/2002 | 10/28/2002 | 10/28/2002 12:00:00 AM | P | FAIL |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie backwater valve required for fitures in the basement 10/28/2002 1:53:10 PM
|
PLM02-02263
| Final | 10/28/2002 | 10/28/2002 | 10/28/2002 12:00:00 AM | P | PASS |
|
|
###-#### sterling construction installed a sprinkler system for this place, the tie in seems ok but the dcva needs testing and they need a permit, didnt want to hold up this project final ok 10/28/2002 3:16:14 PM
|
PLM02-02934
| Final | 10/28/2002 | 10/28/2002 | 10/28/2002 12:00:00 AM | P | PART |
|
|
jennette; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie temp occ ok, pipe t&p drain in approved material and provide an air gap at janitor sink. 10/28/2002 2:17:41 PM
|
PLM02-03273
| Sprinkler (Final) | 10/28/2002 | 10/28/2002 | 10/28/2002 12:00:00 AM | P | PASS |
|
|
|