BLD02-02161
| BLD-Wall cover | 10/25/2002 | 10/28/2002 | 10/28/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/25/2002 at 14:14:26. Contact: ###-####. C/.N issued. 10/28/2002 10:47:02 AM
|
BLD02-02021
| BLD-Wall cover | 10/25/2002 | 10/28/2002 | 10/28/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/25/2002 at 14:15:37. Contact: ###-####. C/N 10/28/2002 10:32:03 AM
|
BLD02-00653
| BLD-Framing/Rough-in | 10/28/2002 | 10/28/2002 | 10/28/2002 12:00:00 AM | P | PART |
|
|
###-#### C/N--ok to insulate 10/28/2002 4:35:35 PM
|
MEC02-02309
| Final | 10/28/2002 | 10/28/2002 | 10/28/2002 12:00:00 AM | P | NH |
|
|
###-#### (1617 garage code) Garge code did not open door--voice mail on telephone--c/n posted on window. 10/28/2002 1:24:23 PM
|
BLD02-02020
| BLD-Framing/Rough-in | 10/28/2002 | 10/28/2002 | 10/28/2002 12:00:00 AM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung C/N posted at rear--need eng. on overheight wall between RV garage and house--ok on trusses--found layout, several other items need correcting--ok to insulate. 10/28/2002 3:30:19 PM
|
BLD02-01774
| BLD-Framing/Rough-in | 10/28/2002 | 10/28/2002 | 10/28/2002 12:00:00 AM | P | PASS |
|
|
###-#### Corrections made--Ok to insulate 10/28/2002 3:58:36 PM
|
BLD02-02505
| BLD-Foundation | 10/28/2002 | 10/28/2002 | 10/28/2002 12:00:00 AM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson wip--80% ready at time of inspection. 10/28/2002 4:19:31 PM
|
BLD02-00636
| BLD-Framing/Rough-in | 10/23/2002 | 10/28/2002 | 10/28/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 10/23/2002 at 12:30:59. Contact: ###-####. Needs trade sign off prior to framing. 10/28/2002 3:39:31 PM
|