ELE04-03356
| Rough-In Permanent Service | 10/27/2004 | 10/28/2004 | 10/28/2004 12:00:00 AM | A | PASS |
|
|
We extended an existing 1"1/4 PVC conduit from the existing outdoor house panel to the existing remote garage indoor panel.Pulled in a 50 amp 120/240 volt 4 wire circuit to the garage and installed a back-fed main breaker with tie-down kit in the existing garage panel.Drove a ground rod at garage also.THANKS!!!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
|
ELE04-03365
| Final | 10/28/2004 | 10/28/2004 | 10/28/2004 12:00:00 AM | P | CANC |
|
|
Paul; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
ELE04-03365
| Electrical Rough-In | 10/28/2004 | 10/28/2004 | 10/28/2004 12:00:00 AM | P | PASS |
|
|
trench inspection
|