FIR04-00236
| INSP-Supply line flush | 10/27/2004 | 10/28/2004 | 10/28/2004 12:00:00 AM | A | FAIL |
|
|
Inspection was for a hydro test. No test done due to faulty pump and leaks. Will try for afternoon 10/28/2004 12:12:01 PM
|
FIR04-00236
| INSP-Sprinkler Rough-in | 10/27/2004 | 10/28/2004 | 10/28/2004 12:00:00 AM | P | CANC |
|
|
Contact: Brian - 24 Air Test, Would like to start the air test after the Hydro test.; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley
|
BLD04-00963
| FIRE-Final Inspection | 10/27/2004 | 10/28/2004 | 10/28/2004 12:00:00 AM | P | FAIL |
|
|
Inspection was actually a conference. I spoke with the superintendant about items I would be looking for at the final inspection. 10/28/2004 2:23:21 PM
|
BLD04-00963
| FIRE-Final Inspection | 10/27/2004 | 10/28/2004 | 10/28/2004 12:00:00 AM | P | FAIL |
|
|
Inspection was actually a conference. I spoke with the superintendant about items I would be looking for at the final inspection. 10/28/2004 2:23:21 PM
|
BLD03-03027
| FIRE-Conference | 10/28/2004 | 10/28/2004 | 10/28/2004 12:00:00 AM | P | DONE |
|
|
Contractor wants to move people out of four existing offices into four new offices. Per Dave Miller Benchmark Construction needs to submit a letter to him stating what they want to do, why they can't get fire alarm and fire sprinkler systems operational at the time they do this and a time line on when work will be completed or else they will need to vacate. 10/28/2004 4:14:10 PM
|
FIR04-00619
| INSP-Sprinkler Rough-in/Hydro | 10/28/2004 | 10/28/2004 | 10/28/2004 12:00:00 AM | P | PART |
|
|
Ok to finish cover of the fdc. Still need to remove the valve and install the ball drip. 10/28/2004 2:27:36 PM
|