Inspections for the day of: Wednesday, October 28, 2009.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-00295 FIRE-Conference10/28/200910/28/200910/28/2009 4:36:42 PMPDONE
On site conference regarding fire code review notes and items needed for final including EM lighting, occ. load sign, PFE's, door hardware, fire sprinkler coverage, etc.
FIR09-00479 INSP-Sprinkler Rough-in/Hydro10/28/200910/28/200910/28/2009 4:34:54 PMPNR
Insulation work incomplete, not ready for inspection at this time per contractor.
BLD09-01289 FIRE-Final Inspection10/28/200910/28/200910/28/2009 4:33:56 PMPPASS
Fire life safety completed satisfactory.
FIR09-00413 INSP-Final Inspection10/27/200910/28/200910/28/2009 4:33:15 PMAPASS
Fire sprinkler final inspection passed, correction items finished, permit final approved.
BLD09-01327 FIRE-Final Inspection10/27/200910/28/200910/28/2009 4:32:17 PMAFAIL
Existing fire sprinkler coverage will need modifications due to remodel work, see fire code review notes for details pertaining.
BLD09-01680 FIRE-Final Inspection10/27/200910/28/200910/28/2009 4:30:02 PMAPASS
Fire life safety passed inspection.
FIR09-00525 INSP-Final Inspection10/27/200910/28/200910/28/2009 4:29:24 PMAPASS
Remainder of fire sprinkler permit work passed site inspection, final okayed.