FIR11-00572
| INSP-Sprinkler Rough-in | 10/28/2011 | 10/28/2011 | 10/28/2011 5:16:59 PM | P | PART |
|
|
Overhead work at the remodel area is approved for ceiling cover.
|
BLD11-01678
| FIRE-Conference | 10/28/2011 | 10/28/2011 | 10/28/2011 5:16:10 PM | P | DONE |
|
|
Regarding project schedule and related trade permit work.
|
BLD11-02116
| FIRE-Final Inspection | 10/28/2011 | 10/28/2011 | 10/28/2011 2:57:55 PM | P | PASS |
|
|
Fire life safety inspection passed.
|
FIR11-00565
| INSP-Final Inspection | 10/27/2011 | 10/28/2011 | 10/28/2011 2:04:41 PM | A | PASS |
|
|
Fire alarm permit work passed inspection. Points map at the panel updated while on site.
|
FIR11-00546
| INSP-Sprinkler Rough-in | 10/27/2011 | 10/28/2011 | 10/28/2011 2:03:12 PM | A | PART |
|
|
Verified added pendent head at the communication/ electrical closet. Overhead is approved for cover.
|
FIR11-00418
| INSP-Final Inspection | 10/27/2011 | 10/28/2011 | 10/28/2011 2:02:00 PM | A | PART |
|
|
Project is not in condition for final at this time.
|
BLD11-00439
| FIRE-Final Inspection | 10/27/2011 | 10/28/2011 | 10/28/2011 2:01:10 PM | A | NR |
|
|
On site meeting with contractor regarding plan review notes and field inspection items for fire life safety approvals.
|